Concrete Construction: Methods and Costs
Chapter 5
UNDER WATER AND OF SUBAQUEOUS GROUTING. 86
Introduction--Depositing in Closed Buckets; O'Rourke Bucket; Cyclopean Bucket; Steubner Bucket--Depositing in Bags--Depositing Through a Tremie; Charlestown Bridge; Arch Bridge Piers, France; Nussdorf Lock, Vienna--Grouting Submerged Stone; Tests of H. F. White; Hermitage Breakwater.