While Guns Cool

_The Postwar Transition--Control of the DMZ and the Military Police Company--Organization of New Defense Positions--Postwar Employment of Marine Units in_ FECOM

_The Postwar Transition_[642]

[642] Unless otherwise noted, the material in this section is derived from: _PacFlt EvalRpt_ No. 6, Chaps. 9, 10; 1stMarDiv ComdDs Jul-Sep 53; 1stMarDiv Type “C” Rpt--Defense of “C” Sector, 27 Jul-31 Oct 53, Folder #3 (this and following 1stMarDiv end-of-war records currently retired in 61 A2265, Box 74, FRC, Suitland, Md.); 1stMarDiv G-3 Jnls, 30 Jul-31 Aug 53; 1stMar Hist of Defense of “D” Sector, 27 Jul-31 Oct 53, Folder #3 (contains brief histories of 1/1, 2/1, 3/1, AT Co/1, 4.2-inch MortCo/1); 5thMar Hist of Def of “D” Sector, 27 Jul-31 Oct 53, Folder #3; 5thMar Hist, same period, Folder #4 (brief histories of 1/5, 2/5, 3/5, AT Co/5, 4.2-inch MortCo/5, DMZ Police Co/5), dtd 26 Dec 53; 7thMar Hist of Defense, 27 Jul 53–10 Feb 54 (brief histories 1/7, 2/7, 3/7, AT Co/7, 4.2-inch MortCo/7), Folder #5; 1stMarDiv-Type “C” Rpt--Defense of “C” Div Sect, 27 Jul-31 Dec 53, Folder #6 (containing, among others, brief rpts 11thMar, 1st TkBn, 1st Engr Bn, 1st MT Bn, 7th MT Bn, 1st KMC Regt, 2d KMC Regt).

Terms of the Armistice Agreement required EUSAK components, including the 1st Marine Division, to carry out a number of major tasks in the months following the end of active hostilities. As stipulated by the cease-fire, UNC troops all along the front withdrew to a new main battle position (MBP) south of the main line of resistance. A military demarcation line (MDL) was established between enemy and friendly positions, corresponding to the end-of-war battle lines. Each side pulled back 2,000 yards from this MDL, with the combined 4,000-yard buffer strip on both sides being known as the demilitarized zone.(DMZ).

A continuous double-strand barbed wire fence, known as the No-Pass Fence, or No-Pass Line, was erected 200 yards below the southern boundary of the DMZ by infantry units manning the MLR at the time of the cease-fire. Appropriate marking signs, in Chinese, Korean, and English, were placed at regular intervals along the fence, prohibiting unauthorized entry into the Demilitarized Zone.

Strict requirements by I Corps enjoined that the “fence on the southern boundary of the DMZ must present a continuous unbroken line except for gates and where it crosses large streams.”[643] Beginning late on 27 July 1953, the 1st Marine Division’s modified mission became that of withdrawal to and organization of the post-armistice MBP, establishment of the No-Pass Line, and defense of the new position in readiness for any possible resumption of hostilities by the enemy.

[643] 1stMarDiv G-3 Jnl, dtd 2 Aug 53.

Division officers, from commanding general to platoon leader level, repeatedly emphasized that the armistice agreement was only a cessation of active fighting. As such, it could be violated by the enemy at any time. The armistice was not a peace, but had simply paved the way for a political conference. As the UNC commander, General Mark W. Clark, had stated, the 27 July document was merely “a military agreement between opposing commanders to cease fire and to permit the opposing sides to arrive at a peaceful solution of the conflict.”[644] Since many felt the cease-fire might be only temporary and not necessarily a permanent peace, all hands showed an attitude of skepticism and watchful waiting. There was little disposition or time for celebration. The response of many men to the complete lack of noise across the front was one of simple restlessness and expectancy.

[644] 1stMarDiv ComdD Aug 53, App. VII, Annex E to IMARD-00-10-53, p. 2.

From the 7th Marines just engaged in the vicious Boulder City battle, the reaction

... was one of disbelief and caution. Extensive movements of the enemy during the night of 27 July only bolstered the feeling of wariness and suspicion. Only after dawn broke on 28 July, without any shots being fired, did the realism [reality] of the truce become apparent, followed by a wide-spread sensation of relief.[645]

[645] 7thMar Hist, p. 1, Folder #5.

A 5th Marines representative noted:

The fact that negotiations had been going on for some time with numerous false alarms dulled the edge for most people, and a prior announcement that the agreement would be signed took most of the steam away from the actual culmination of the fighting ... in effect [the cease-fire] meant “we’re giving you ten dollars but don’t spend it for we might take it back.”[646]

[646] Co H Rpt of Post-Armistice Activities, Encl (2), CO 3/5 ltr ser 00208, dtd 11 Jan 54, p. 1, in 3/5 Hist, Folder #4.

The view expressed by a Korean regimental commander was that:

Many of the officers and men were relieved to see the fighting cease; others, particularly among the officers, would rather have seen the fighting continue until the country could be united. However, the officers and men accepted the cease-fire as a military order and acted accordingly.[647]

[647] 1st KMC Regt Rpt, dtd 7 Apr 54, p. 1, in 1stMarDiv Type “C” Rpt, Folder #6.

Division MLR units on 27 July had been the 1st KMC, the 5th Marines, and 1st Marines in the left, center, and right regimental sectors, respectively. With the pullback of the division to new defensive positions, the 5th Marines--the infantry regiment that had not been heavily engaged in recent combat--was assigned the mission of defending the forward general outpost (GOP) line across the division front. In addition, the 5th Marines, or Northern Regiment as it came to be called since it was the only one remaining north of the Imjin River, was also charged with police duties and security of the UNC part of the DMZ located in the division sector.

Marine regiments, battalions, and companies began withdrawing from the DMZ to move to their new MBP early on the morning of 28 July, less than 24 hours after the signing of the Korean armistice. To some extent, the relocation of units was facilitated by the fact that the forward part of the division sector had been defended by the three MLR regiments. Since the lateral boundaries, initially, would remain the same, the three 5th Marines battalions were to occupy positions held by the three line regiments. Orders called for 2/5 to occupy the left regimental sector previously held by the 1st Korean Marine Corps Regimental Combat Team; 1/5 to man the 5th Marines center sector; and 3/5 to assume the right regimental sector.

Whereas 5th Marines battalions were directed to occupy their new positions by D+84 hours (or 2200, 30 July), other units in some cases were not required to pull out of their respective positions until positions by D+108 hours (2000, 1 August). This was done to insure that no portion of the division front was left unmanned during this very critical period. It did, however, force small units to make two moves and “in one instance, a battalion and a regimental headquarters were occupying the same area.”[648] Because of the need to move almost immediately, only a hasty physical reconnaissance was made. Small unit leaders were not always familiar with the area and this gave rise, in some instances, to confusion about exact unit boundaries. This resulted in a later relocation of several units.

[648] 5thMar Hist, dtd 26 Dec 53, p. 4, Folder #4.

For the first 72 hours after the armistice, Marines were engaged in a maximum effort to tear down installations, salvage fortification materials, and physically move out of the Demilitarized Zone. Infantry units were responsible for this destruction and salvage work within assigned sectors, with 1st Engineer Battalion assistance and supervision, as available. For the nearly 50 Marine infantry companies and attached KMC units, the order of priorities for those first three days generally appears to have been:

(1) Recovery of ordnance and removal to company supply dumps;

(2) Removal of all combat equipment to supply dumps; and

(3) Destruction of field fortifications and salvage of all bunker timbers and other building materials from the old MLR sector.

Specifications of the initial armistice agreement, as originally drawn up in August 1952, had called for a complete withdrawal of all military personnel, supplies, and equipment from the DMZ within 72 hours after the cease-fire. Destruction of all fortifications within the DMZ likewise was to be accomplished within this 72-hour deadline. It subsequently became evident, however, that it would be impossible to complete the entire job of dismantling and salvaging MLR fortifications within a three-day period. In mid-June 1953, CinCUNC had advised major commands that Communist and UNC negotiators had agreed to extend the original 72 hours to an additional 45-day period, or until 13 September.[649]

[649] Other modifications and deadline extensions included: (a) withdrawal of all military forces, supplies, and equipment from coastal islands and waters north of the 38th Parallel within 5 days increased to 10 days; (b) Personnel and equipment to be evacuated from Korea only through those ports of entry specified in the armistice agreement. 1st MAW ComdD, Vol. III, Jun 53, Msg from CinCUNC to CG, AFFE, COMNAVFE, CG FEAF, info 1st MAW and others, dtd 17 Jun 53.

Division order 1MARD-OP-11-53, issued at 1600 on 27 July, clearly stated that all “removable materials”[650] would be taken out of the DMZ within the immediate 72-hour period following the effective date of the armistice (2200, 27 July). The end-of-war order further directed that division personnel would “locate and list all valuable materials which should be salvaged but cannot be moved during this prescribed time ... an additional period of 45 days, after the initial 72-hour period, will be used to complete salvage operations within the Demilitarized Zone under the supervision of the Military Armistice Commission....”[651]

[650] 1stMarDiv Folder “Withdrawal to and Organization of Post Armistice MBP 1MARD-OP-11-53-July 1953,” dtd 27 Jul 53.

[651] _Ibid._

From top to lower echelons, however, a breakdown in communications seems to have taken place in the maze of post-truce orders. At the pick and shovel level, initial instructions were sometimes to the effect of:

Salvage everything possible in the 72 hours we have to get out of here. If unable to salvage; then destroy.... No word was passed that there would be a period following the truce in which we could conduct a thorough salvage operation. Had this information been available, a more systematic process could have been devised....[652]

[652] Co H Rpt, _op. cit._, p. 1, 3/5 Hist, Folder #4.

One regiment commented “that early directives from higher authorities did not clearly establish the relative priority for salvage operations.”[653] More specifically, 1/7 related:

[653] 7thMar Hist, dtd 28 Jan 54, p. 5, Folder #5.

Periodically, messages would be received stressing certain items of salvage as critical. This required revision of working schedules and shifting of men to other jobs ... if all salvageable material had been designated as critical at the commencement of salvage operations, the work could have been completed more expeditiously....[654]

[654] 1/7 Hist, in 7thMar Hist, p. 4, Folder #5.

A 5th Marines observer commented on the confusion in these words:

It is evident, however, that in dissemination to some of the lower echelons, pertinent information was either ignored or improperly passed ... some Company Commanders were under the impression that the entire job of dismantling and salvaging was to be completed in 72 hours. The result of this misconception was that in some areas bunkers were filled in with earth and then later had to be evacuated [excavated] in order to salvage the materials.[655]

[655] 5thMar Hist, p. 1, Folder #4.

Initial salvage operations were conducted from 28–30 July. Trenchlines were filled in; tank slots dozed under; bunkers torn down and usable timbers carried to salvage collecting points.

Beginning on 28 July, 1st Marines line units on the division right flank came under operational control of the 5th Marines, with their new mission being to “man an outpost line on the most formidable ground south of the southern boundary of the newly planned Demilitarized Zone in the MLR regimental sector.”[656] Movement to the new outpost positions was under way by 29 July.

[656] 1/1 Hist, in 1stMar Hist, p. 1, Folder #3.

As the Marine units moved south to establish their new outpost positions in previously undeveloped areas, the limited engineering equipment available for simultaneously dismantling bunkers and constructing new camps tended to slow the latter job. Personnel of 1/1, which had utilized 124 vehicles for the transfer, were among those housed in widely scattered areas for several days during the moving and setting up of new camps. Torrential rains, of several days’ duration, which had engulfed the division’s transport operations on so many occasions in the past, caused the new campsites to turn into a muddy quagmire. Men of 2/5, during part of the relocation period, lived in shelter tents until regular tentage became available.

A short moratorium on salvage activities took place between 31 July-3 August while the details for entry into the DMZ were being settled. Marine division salvage efforts encompassed an area extending from the MLR to the sector rear, in the vicinity of the KANSAS Line, as far as the Imjin River. Work in the areas south of the DMZ did not begin, in most cases, until after 13 September, and fortifications of secondary defense lines were left in place.

All salvage materials removed from the DMZ were placed in battalion and regimental dumps where they would be readily available for use in building the new battle positions. Recovery of ammunition was accomplished in some sectors early on the 28th. At the far right flank of the division line, the scene of the Marines’ final action in the Korean War, salvage efforts took on an additional task. Most of the first day was allotted to recovery of the dead at Hills 119 and 111 and the removal of their bodies to rear areas.

Although the enemy had policed in front of Marine lines on the night of 27–28 July, at first light the CCF indicated the desire to recover their dead from Marine positions. Enemy parties were thus permitted to temporarily enter 3/1 lines to retrieve these bodies. This procedure provoked some consternation and renewed vigilance by Marine personnel upon “seeing the enemy moving around within a stone’s throw of our front lines so soon after his determined attacks.”[657]

[657] 3/1 Hist, in 1stMar Hist, p. 2, Folder #3.

As soon as the Marines’ own corresponding unhappy task was completed, ammunition was removed to supply dumps, a laborious task not finished in the 1st Marines sector until noon on 29 July. The fierce fighting that had started after dark on 24 July and lasted until the morning of the ceasefire also accounted for the large amount of salvageable items found in the area including M-1 rifles, helmets, armored vests, and quantities of blood serum. All ordnance, equipment, and building materials were separated into stockpiles of good or nonrepairable items. Ammunition in excess of a one-half a basic JAMESTOWN fire unit (a unit of fire is the amount of ammunition a weapon will use in a day of combat), was placed in company and battalion dumps for collection by regimental ordnance teams.

On occasion, salvage of friendly ammunition was made more difficult because COP stockpiles struck by enemy mortar fire contained both damaged and live, usable ammunition mixed together. Although 1st Engineer Battalion ordnance disposal teams covered the positions thoroughly, unexploded mortar and artillery rounds were often unearthed by Marines filling in the old trenches, knocking down bunkers, or recovering wire. Anti-personnel mines forward of the protective wire prevented full salvage operations in some cases.

Three Marine combat outposts required special attention. These were Bunker Hill and Esther, in the central part of the MLR, and Ava, in the right sector. Although occupied by Marines at the time of the cease-fire, the COPs fell north of the MDL and thus became inaccessible for salvage after the initial 72-hour period. The positions were reduced and materials salvaged in the allotted time.

During the first night, Marines of 3/5 (originally the right battalion, center sector) removed more than 11 truckloads of ammunition. Outposts Hedy and Bunker offered a particular problem due to the distance from the MLR and nearest road. As described by some veterans of 24-hour work crews, the trail to Bunker was “particularly tortuous and made the packing of first the ammunition and later the fortification materials a physical ordeal.”[658]

[658] Co I Rpt of Post-Armistice Activities, Encl (3), CO 3/5 ltr ser 00208, dtd 11 Jan 54, p. 1, in 3/5 Hist, Folder #4.

At Hedy the extreme proximity of CCF and Marine lines posed an additional difficulty. On the afternoon of the 28th, an interval of 20 yards separated the two; by the following day the enemy had completed his work in the area and was never again that close. Operations here were also somewhat delayed “by an influx of visitors: newspapermen and newsreel cameramen all interested in the great numbers of enemy visible to our front engaged in the same tasks that we were.”[659]

[659] _Ibid._

Dismantling bunkers was the single biggest problem of the entire salvage program. This operation began at dawn on the 28th and was not completed until the second week of September. Ultimately, more than 500 bunkers were reclaimed from MLR materials and installed in the new division position. Most of the bunkers were built of 12x12 timbers, buried deep in the ground, fastened together with 10- to 16-inch spikes. Infantry organic tools and equipment were inadequate to dismember bunkers so constructed. Crowbars, picks, shovels, pinch bars, and sledge hammers were all in short supply. Engineer equipment and other tools were not stockpiled in sufficient quantity to buttress a demolition program of such magnitude.

In places where the terrain permitted operation of bulldozers, their use drastically shortened the time spent uncovering bunkers. Where these had been emplaced on reverse slope positions of steep hills, however, the timbers had to be removed by hand. The latter was the generally prevailing situation.

Not surprisingly, throughout the demolition program “basic equipment was usually the Marine himself and his ingenuity.”[660] Effective on-the-spot, problem-solving was seen in the many “jury-rigged” levers or prybars fashioned from timbers and crowbars from scrap steel. The “Korean Sling Method,” with heavy rope and carrying poles, was often used to move heavy timbers. Trucks equipped with winches and wreckers were effective for this purpose. Dozer tanks were also used, but only after having their guns removed as required by the armistice agreement. Division engineers experimented at some length with three different ways to pull apart the larger 12x20 bunkers, in which the cross beams were secured to columns with two-feet spikes. The least technical approach which involved “winching the bunkers out of their positions and bouncing them down a steep slope until they broke apart proved the most successful and the quickest method.”[661]

[660] 5thMar Hist, p. 2, Folder #4.

[661] 1st EngrBn Rpt, dtd 19 Apr 54, p. 3, Folder #6.

Besides the lack of engineering tools, limited motor transport facilities and manpower shortages also created difficulties. Heavy commitments across the front, with virtually every division unit displacing to a new location, resulted in a shortage of trucks that slowed both salvage and logistics operations. Assignment of personnel to around-the-clock shifts during the critical initial 72-hour period and use of lighting trailers produced maximum results from the available equipment. Company G, 3/5 reported that its men were allowed “ten minute breaks every hour and, because of the heat, they were given from 1200 to 1500 hours for sleep and worked all through the darkness.”[662] During this three-day period alone, the 1st Tank Battalion transported 275 tons of ammunition and fortification material, or a total of 111 loads in 2½-ton trucks.

[662] Co G Rpt of Post-Armistice Activities, Encl (1), CO 3/5 ltr ser 00208, dtd 11 Jan 54, p. 1, in 3/5 Hist, Folder #4.

At this time, the restrictive provisions of the truce agreement led to a problem involving the use of heavy engineer vehicles. After 3 August, it was difficult to bring into the DMZ any hauling or motorized gear that could be construed as “combat equipment.” The 2½-ton trucks, however, continued to be employed for much of the motor transport operations.

By 0930 on 1 August, the 1st Marine Division had completed its withdrawal and manned the new MBP south of the DMZ. The 5th Marines continued its mission as the northern outpost regiment. South of the Imjin, the 7th Marines occupied the right regimental sector; the 1st KMC moved into the center of the MBP; and the 1st Marines became the division reserve.

Between 3 August-13 September, each rifle company sent daily working parties into the DMZ to excavate those sectors occupied by Marine units on 27 July. Depending on available transportation, the size of the working parties varied from 25 to 100 men. These shortages were alleviated, to some extent, by KSC (Korean Service Corps) personnel.[663] The heavy-duty, “pure drudgery without glamour,” monotonous tasks performed in tropical weather, 103 degree-plus temperatures and high humidity, caused one Marine infantryman to comment ruefully:

[663] KSC units were deactivated shortly thereafter. Following a EUSAK order in August to begin discontinuing use of the Korean laborers, the number of KSC workers was reduced. By the end of October, the 103d KSC Regiment attached to the division had been completely disbanded.

Close officer supervision proved to be absolutely necessary due to the nature of the work, which made the maintenance of interest and enthusiasm in the average individual, very difficult.[664]

[664] 1/5 Hist, in 5thMar Hist, p. 3, Folder #4.

In another 5th Marines unit the motivation gap was partially solved by “use of a graph posted on the bulletin board showing the money value of materials salvaged each day, with the exhortation to better the previous day’s total.”[665]

[665] 4.2-inch Mort Co/5, in 5thMar Hist, p. 3, Folder #4.

Throughout the month of August and until 13 September, destruction of MLR positions and removal of materials took place concurrently with organization of defensive positions in the new sector. After the initial three-day period and its top priority of physical withdrawal of troops from the DMZ, division tactical requirements called for completion of the MBP as rapidly as possible. This now became the first priority. New company perimeter defense sites, battalion blocking positions, coordinated fire plans in event of attack, counterattack orders, and evacuation routes were mapped out. Construction began immediately. By 5 August, the new battalion camps had begun to take form and work on the blocking positions was in progress. Marine units, like other UNC forces, had to be prepared at all times for any act of enemy aggression. Whether the Communists would continue to respect the cease-fire agreement or not remained an open question.

Stockpiling, meanwhile, had been accomplished at company, battalion, and regimental dumps. All materials were stacked by size to facilitate reissue during construction of new positions. As much as 90 percent of the materials salvaged were usable in the new fortification. Although a certain amount of inter-battalion exchange took place, battalion stocks--with the exception of sandbags--were usually adequate to provide sufficient fortification materials for the rebuilding. For 5th Marines units that had the least distance to relocate, timbers moved from the old MLR in the morning were sometimes emplaced in the new defensive positions by late afternoon. Helicopters, as well as trucks, were used extensively to move stockpiles from company and battalion areas to rear regimental supply dumps.

Division MLR supplies salvaged by the 5th Marines represented:

T/E material 12 tons

Signal equipment (wire) 2,000 miles

Engineer items barbed wire 2,850 rolls concertina 340 rolls pickets, 6-foot 11,000 pickets, 3-foot 8,000 sandbags 339,000 timbers (from 3×8 to 12×12) 150,000 linear feet

Total tonnage 2,000 short tons

The 2nd Battalion, 5th Marines estimated that wire rolls, sandbags, timbers, and other materiel “recovered by this battalion and assisting units was valued at approximately $150,000.”[666]

[666] 2/5 Hist, in 5thMar Hist, dtd 12 Dec 53, p. 3, Folder #4.

By early September, the 1st Marine Division work priority once again had reverted from camp construction to salvage operations. It had become apparent that another maximum effort period would be necessary if all salvageable materials were to be removed from the DMZ no later than the 13 September deadline reaffirmed by I Corps on 2 September. During this last phase of salvage work, participating battalions again came under operational control of the 5th Marines. Elements of the 1st and 11th Marines, neither of which at that time had a sector of responsibility for salvage, as well as KMC troops, augmented the organic units. One battalion alone, 1/1, detailed 400 men in work parties. At 2130, on 13 September, the division completed its salvage mission in the Demilitarized Zone, thus meeting the specified time limit. Under terms of the armistice agreement, after 13 September all personnel were prohibited from entering the Korean Demilitarized Zone. The only exceptions were members of the DMZ police companies of the Allied and Communist sides and other persons specifically authorized passage by the Military Armistice Commission (MAC).

_Control of the DMZ and the Military Police Company_[667]

[667] Unless otherwise noted, the material in this section is derived from: 1stMarDiv G-3 Jnls, 30 Jul-31 Aug 53; Demilitarized Zone Police Co Rpt, dtd 18 Dec 53, in 5thMar Hist, Folder #4; MSgt Paul Sarokin, “DMZ Marines,” _Leatherneck_, v. 37, no. 10 (Oct 54), hereafter Sarokin, “DMZ Marines.”

Since the late July signing of the armistice, one of the missions of the 5th Marines GOP regiment had been the marking, control of entry, and policing of the DMZ. At the time the No-Pass Fence was constructed, roadblocks, called “crossing stations” were located at each route leading into the DMZ. Initially, 21 crossing stations were opened across the regimental front. When it later became apparent that not all of these security points would be needed, some were closed and the roads barricaded. Each crossing station was manned by a minimum of two sentries who insured that no weapons were carried into the DMZ. Along the fence itself, signs printed in three languages prohibited unauthorized entry into the southern boundary of the DMZ. On roads and trails approaching the southern boundary fence, additional signs placed 200 yards from the fence warned of the proximity to this southern end of the military zone. Air panels and engineer tape also marked the DMZ.

After 31 July, entry into the DMZ was limited to those persons holding a valid pass, issued under the auspices of the Military Armistice Commission. Authority was also delegated to CG, U.S. I Corps to issue passes for the I Corps sector. With salvage operations requiring a large number of passes, authority was further delegated to the CO, 5th Marines, to issue permits for the regimental sector, good only for unarmed[668] working parties engaged in salvage operations. The regimental S-2 established a pass control center, and anyone desiring to enter the DMZ made application through that office. Each pass contained the bearer’s name, rank, service number, organization, number of personnel and vehicles in the working party, and reason for entry.

[668] With the exception of the DMZ Police, all persons entering the DMZ for salvage were required to check their weapons at the zone entry.

Security procedures also required that a log book of all zone entries and exits be kept by crossing station guards. This information was ultimately telephoned or radioed to higher echelons. At battalion and regimental levels a master log or “status board” indicated the number of people, vehicles, passes, and pass identification numbers present in the DMZ at all times. As the salvage program reached its height in August and early September, just the “issuance and recording of passes and the checking of the working parties into the zone became a major operation.”[669] Between 4 August-13 September, a total of 3,523 vehicle passes and an unknown number of personnel permits were issued. With the ending of salvage operations on 13 September, the Marine regiment no longer issued DMZ passes, although I Corps continued to authorize MAC personnel entry permits.

[669] 5thMar Hist, p. 2, Folder #3.

A stipulation set by the armistice agreement was that both the Communist and UNC sides police their respective sections of the DMZ with “civil police,” not to exceed 1,000 in the zone at any one time across the entire front. With further allocation of police personnel to army and I Corps units, the number of 1st Marine Division police on duty within the DMZ at any one time was originally set at 50. Since no civilian police were available to either side, requirements were modified so that a specially designated military unit, in lieu of civil police, could be employed and the original quota enlarged if this became feasible.

Due to the delicate political aspect of the DMZ as well as the non-repatriated POWs in the custody of Indian forces, security measures were of utmost importance. The Marine division activated a new unit, the 1st Provisional Demilitarized Zone Police Company at 0800 on 4 September. The new unit, charged with maintaining security throughout the 1st Marine Division sector, became operational three days later. Commanding officer was Captain Samuel G. Goich, formerly of F/2/7. Each regiment from the division furnished 25 enlisted men and 1 officer to form the company, including standby personnel. On 21 September, the DMZ Police Company was attached to the 5th Marines. Police Company personnel were required to have had at least three months’ Korean service, a General Classification Test score of at least 95, a minimum height of 5 feet 10 inches, and were “selected for physical stature and mental capacity required in coping with the delicate situation existing within the Demilitarized Zone.”[670] The average DMZ company member was said to know “map-reading on an officer level, first aid, radio, and understand the fine print of the cease-fire agreement like a striped-trouser diplomat.”[671]

[670] 1stMarDiv ComdD, Sep 53, p. 2.

[671] Sarokin, “DMZ Marines,” p. 23.

The mission of the Marine provisional police company as set up by the truce agreement was to furnish military police escort for special personnel visiting the DMZ and to apprehend truce violators or enemy line crossers. Visitors who rated a military escort were members of MAC, Joint Observer Teams, Neutral Nations Supervisory Commission personnel,[672] NNSC inspection teams or agency assistants, or other VIPs authorized to enter the UN half by the Military Armistice Commission.

[672] The Neutral Nations Supervisory Commission supervised all phases of implementation of the armistice. It consisted of the Secretariat and 20 neutral nations inspection teams staffed by personnel from Sweden, Switzerland, Poland, and Czechoslovakia.

Six Marine DMZ military policemen, each armed with a .45 caliber pistol and M-1 rifle, accompanied UN joint observer teams to the demarcation line, midpoint between enemy and friendly boundaries, but did not cross the MDL. I Corps orders directed that military police were to be “responsible for the safety of the United Nations members of the team and, when meetings are held south of the demarcation line, they will be responsible for the safety of the CCF members of the team as well.”[673]

[673] 1stMarDiv G-3 Jnl, dtd 1 Aug 53, msg CG I U.S. Corps to addees, dtd 31 Jul 53.

Major tasks performed by the 104-man company operating within the 2,000-yard wide, 28-mile-long zone were:

To maintain surveillance over civilians within the UN half of the DMZ;

To apprehend and deliver to the Division Provost Marshal any line crossers encountered who did not possess an authorized pass, regardless of the direction from which such persons entered the DMZ; and

To provide check points on known routes through the zone and observation posts, especially during the hours of reduced visibility, and telephone all suspicious incidents to Regimental S-2.

DMZ Police Company personnel operated in motorized patrol teams and traveled the entire division sector in radio or cargo jeeps. One platoon was kept on a standby basis at camp to serve as a mobile reserve in the event of an emergency. The roving patrols submitted reports of all incidents, which were then compiled in a company report. A copy was submitted to the S-2, the Northern Regiment, and 1st Marine Division G-2.

UNC security measures at all times were strict and uncompromising in the Korean DMZ buffer zone. This included the salvage period, the BIG SWITCH prisoner exchange that took place within the division sector at Freedom Village from 5 August-6 September, and the lengthy nonrepatriate POW settlement that extended through January 1954. In places where the military demarcation line was not marked on the ground or clearly recognizable, the conservative ruling was to stay at least 500 yards south of its estimated location. This applied both to body recovery and salvage operations. The No-Fly line was scrupulously verified.

Alleged violations charged by the CCF/NKPA were checked out with the Marine ground observation posts set up in August to record all movements of fixed-wing (reconnaissance) and rotary aircraft in the area. Helicopters were allowed to fly in the DMZ but no closer than the 500 yard limit from the MDL. Helicopters operating forward of CPs of 5th Marines units having sector responsibility were required to obtain clearance from the ground unit concerned for each flight. Medical evacuation copters, generally, were exempted from this restriction and authorized a standing clearance.

Commitments for the DMZ Police Company increased substantially with arrival of the nonrepatriated POWs at their camp in the DMZ corridor west of the 2d Battalion, 5th Marines area. The Communist “explainers,” as well as Polish and Czech members of the neutral Nations Commission, had to be escorted while in the UN half of the DMZ. This required that a 24-hour checkpoint and escort cadre be established in the zone. As the number of enemy sightings, a daily occurrence in the DMZ, continued to increase, the size of the police patrols increased correspondingly. A typical example was related by a member of the police company:

It was common practice of the Communists to have a group of their men, supposedly their DMZ Police, walk up to the Military Demarcation Line and either stand close to it or step across. When one of our patrols approached in superior numbers to attempt to apprehend them, the Communists would immediately reinforce with more men. This made it necessary to have our patrols at sufficient strength that they could protect themselves from being kidnapped.[674]

[674] Demilitarized Zone Police Co/5 rpt, p. 4, in 5thMar Hist, Folder #4, _op. cit._

As these requirements for security increased, the original complement of approximately 5 officers and 99 men became inadequate to patrol the DMZ. By late October the T/O strength of the 1st Provisional Demilitarized Zone Police Company had been increased to 6 officers and 314 men. Authorization for the number of police personnel on duty in the DMZ had similarly been augmented from 50 to 175.

During the September salvage operations, five Marines in the DMZ were taken into custody by the Chinese Communists. Charged with being in unauthorized territory and violating terms of the armistice agreement, they were later returned to United Nations jurisdiction.

_Organization of New Defense Positions_[675]

[675] Unless otherwise noted, the material in this section is derived from: 1stMarDiv ComdDs Jul-Sep 53; 1stMarDiv Type “C” Rpt Defense of “C” Sector, 27 Jul-31 Oct 53, Folder #3 (this and following 1stMarDiv end-of-war records retired in 61 A2265, Box 74, FRC, Suitland, Md.); 1stMar Hist of Defense of “D” Sector, 27 Jul-31 Oct 53, Folder #3 (contains brief histories of individual units); 5thMar Hist of Defense of “D” Sector, 27 Jul-31 Oct 53, in Folders #3 and #4; 7thMar Hist of Defense of “D” Sector, 27 Jul 53–10 Feb 54, in Folder #5; 1stMarDiv Type “C” Rpt Defense of “C” Div Sect, 27 July-31 Dec 53, Folder #6 (containing, among others, brief rpts 11thMar, 1st TkBn, 1st EngrBn, 1stMTBn, 7th MTBn, 1st KMC Rgt, 2d KMC Rgt).

Upon withdrawal from the demilitarized zone and organization of the MBP, the Eighth Army established its plan for defense on a wide front. This was based on the organization of strongpoints disposed in depth, with planned counterattacks by mobile reserves.

As it had during active hostilities, the 1st Marine Division in the post-armistice period continued as one of the four UNC divisions manning the general outpost and MBP in the U.S. I Corps sector. Immediately east of the division was its long-time neighbor, the 1st Commonwealth Division. Still further east in I Corps were the 1st ROK and U.S. 7th Infantry Divisions.

Since 1 August, the Marine division had continued to outpost the most favorable terrain in its sector below the southern boundary of the DMZ. The division manned the No-Pass Line and prepared its defenses to resume full scale military operations, if necessary. The Munsan-ni Provisional Command, composed of the Marine-Navy-Army personnel responsible for implementing the final prisoner exchange, was also headquartered in the 1st Marine Division sector.

The strongpoint organization of the division’s main battle position was accomplished by the deployment of the 5th Marines at the general outpost line of resistance (or OPLR, a term and concept not in use since April 1952). The outpost defense concept embodied a number of forward positions, lightly held in actual numbers of men but strongly defended in numbers of automatic weapons and firepower. (This capability was possible due to the excess number of automatic weapons on hand, above normal T/E allowances, which previously had been required by MLR defenses.) In the organization of the positions, emphasis was placed on construction of bunkered observation posts, the emplacement of automatic weapons with flanking fires, and clearing of fields of fire for these weapons.

Basically, the general concept of OPLR defense was to establish mutually supporting defensive positions across the front, as well as to develop additional defense in depth positions whose strength increased from front to rear. The positions thus formed successive defense lines, from the southern DMZ boundary--the new Marine division front--south to the KANSAS Line, the Main Battle Position. (These defense lines were the old secondary defensive lines of WYOMING, KANSAS, and KANSAS SWITCH.) The KMC, 1st Marines, 7th Marines, and other units located in the KANSAS vicinity engaged in bunker construction and trench improvement. Battalion fire plans coordinated the organic, attached, and supporting weapons. Construction of the new positions and development of the KANSAS Line would be a continuing process throughout the rest of the year.

The 1st Marines received the assignment of developing the blocking positions, most of these battalion-sized strongpoints. As in the past, division support units continued to be located in the old rear supply areas south of the Imjin. In early August the division had stationed the 7th Marines in the right sector; the 1st KMC in the center; and the 1st Marines, to the south of the KMC sector. The 11th Marines, to the rear of the 7th Marines, had displaced its artillery, relaid, and was prepared to fire in support of the general outpost and MBP. (Map 35.) Additional artillery battalions included I Corps and army units. Essentially these were the positions held until early October when, during a period of political unrest resulting from the prisoner exchange, the 1st Marines relieved the 1st KMC/RCT in the center sector (which held the southern approaches to Freedom Bridge and the nonrepatriate war compound). The Korean unit then relocated to blocking positions and assumed the mission of reserve regiment.

Marine support units--motor transport, tank, service, medical, aerial liaison (VMO/HMR)--were in the same general rear area, as was the headquarters of the U.S. 25th Infantry Division. The Marine Division CP continued to be located at Yongji-ri, although construction of a new site further south at Chormyon was due to be completed by engineer personnel on 1 October. The division railhead and truckhead remained, respectively, at Munsan-ni and Ascom City. To the left of the KMC sector was the 1st Amphibian Tractor Battalion. Still further west, separated from other units by the Han River, was the Kimpo Provisional Regiment, in its former wartime sector.

As the division OPLR regiment, the 5th Marines held a line 36,000 yards in length--about 21 miles--roughly corresponding to the front manned by three regiments during the war. The OPLR sector included the entire area in the divisional zone of responsibility north of the Imjin. Boundaries of the 5th Marines territory were the southern DMZ truce line on the west and north, the Samichon River to the east, and that major water barrier, the curving Imjin River, to the rear.

After establishment of the DMZ, the division occupied unfavorable low ground poorly suited to the defense and inferior to that held by the enemy--continuing the same situation that had existed during the period of stabilized combat operations in West Korea. Almost without exception the southern boundary of the DMZ prohibited the Marines from moving onto the commanding terrain, as the No-Pass Line was behind or along the reverse slopes of the high ground. On the other hand, in most cases the CCF had the advantage of having forward slope positions as well as the crests plus most of the commanding terrain in the area.

Communist territory in the northern DMZ sector included the former strongholds of Yoke, Bunker Hill, Carson, Reno, Vegas, Berlin, East Berlin and Warsaw. Within the Marine division postwar area were the Panmunjom Corridor and outposts Marilyn, Kate, the Boulder City hills, and the Hook. Much of the terrain between the major hill positions along the 5th Marines regimental front and the Imjin River consisted of low-rolling hills rising abruptly out of the rice paddies.

Construction of new positions and the defense system of the 5th Marines was based on several assumptions about enemy capabilities, made by G-2 and the new regimental CO, Colonel Rathvon McC. Tompkins, who had assumed command on 2 August. These were: that in the event of resumption of hostilities by the CCF the enemy would use his jet fighters and bombers in support of operations; that he would continue to have numerical superiority in artillery; and that the northern outpost regiment would have no reinforcement or surface resupply from units south of the Imjin.

The defense plan for the forward part of the 5th Marines sector in event of a resumption of hostilities called for furnishing patrols equipped with radios and FO teams to occupy Hills 155, 229, and 181. (Hill 155 was directly south of the DMZ in the 2/5 left battalion sector; Hills 229 and 181 were, respectively, just inside and just outside the southern boundary of the truce line in the center 1/5 sector.) From these three elevations the patrols would then have the mission of bringing down artillery fire on enemy concentrations and relaying communications about the situation to the friendly main attack force. Other critical hill masses in the OPLR regimental sector were Hill 126 (in the 3/5 eastern battalion sector, just inside the Marine side of the DMZ) and Hill 163, in the Hook area. The latter hill was not as suitable for defense since it was located south of the military demarcation line and was thus less accessible.

These hill masses so completely dominated the major enemy approaches through the division sector to the Imjin, the lower river crossing sites and bridges, that their occupation by Marine personnel was considered essential in the event of any attack. Hill 229, adjacent to the Chan-dang corridor and part of the 229-181 axis, was considered the most critical terrain feature in the entire northern section.

Key areas to the rear of the 5th Marines’ sector were the two operating bridges (Freedom in 2/5 territory and Libby on the 3/5 right) and the two interior crossing sites (Honker and Spoonbill). All provided access to the Imjin and division support units deployed on the south side of the river. In the event of threatened hostile attack, the Northern Regiment was under orders to destroy the bridges to prevent their use by the enemy on any attempted advance to the rear.

Strong perimeter defenses, called “Bridgehead Positions” were to be built by 5th Marines’ battalions. Two were to protect the two bridges and a third, to include both ferry sites. Between the forward defended localities and the rear bridgehead positions, alternate and secondary sites were organized to create mutually supporting defenses in depth. The bridgeheads were a combination of linear and strongpoint defense, capable of withstanding severe pressure.

Organization of the defensive positions in the 5th Marine sector was complicated both by peculiarities of the terrain and political restrictions due to proximity of the DMZ. In addition to the regiment’s excess frontage, the demilitarized zone immediately to the front precluded use of either aerial or motorized reconnaissance for early warning. Security measures for the OPLR were less than ideal. Neither proper patrols nor a covering force in front of the OPLR was possible; the best that could be done was to maintain patrols along the friendly side of the No-Pass Line.

As the regimental left battalion pointed out: “Location of the DMZ and the No-Pass Line made the trace of the OPLR follow an artificial and arbitrary line rather than that of the best terrain.”[676] The most critical terrain feature in the sector, Hill 155, was located just outside the southern boundary of the DMZ. Although its possession was essential to successful defense of the OPLR and the bridgehead defense positions being developed to the interior and rear of the battalion sector, Hill 155 could not be occupied because of the armistice agreement. The solution to the problem was simply to occupy the best ground adjacent to the No-Pass Line.

[676] 2/5 Hist, in 5thMar Hist, dtd 12 Dec 53, p. 4, Folder #4.

Placement of automatic weapons was a factor of great importance in organizing the defensive positions. In order to accomplish the mission of an OPLR, weapons had to be situated to bring the enemy under fire at maximum ranges. Accordingly, machine guns and other weapons were placed on high ground well to the front. Some Marines commented that:

Many individuals having the MLR concept in mind insisted that weapons should be located forward on low ground to provide grazing fire. A period of education was required. For the same reason, it was necessary to place 81mm mortar and 4.2-inch mortar positions further forward than they would normally be in support of the MLR.[677]

[677] _Ibid._

The problem of establishing depth to the defensive positions was never solved to the satisfaction of everyone. This was due primarily to the extended front which necessitated using more units for support elements than would normally be done. This situation was partly alleviated by establishing some unit defensive sectors further to the rear in the company areas.

Another difficulty was the inadequate allocation of ammunition: one-half JAMESTOWN load on position, and another half-load available at the regimental dump. The JAMESTOWN load unit had been developed for use in a stabilized defense situation where automatic weapons were aimed as the enemy came in close proximity to the MLR. On the other hand, OPLR machine guns and weapons were required to open up at maximum ranges and might well be fired for extended periods of time. It was calculated that A4 machine guns firing at medium rate (75 rpm) would expend the one-half JAMESTOWN load in 22 minutes, while an A1 machine gun at medium rate (125 rpm) would exhaust the same load in 13 minutes. A partial improvement was obtained by moving the ammunition loads from regimental to battalion dumps although the basic problem of limited allocation--shared also by rear infantry regiments--continued to exist.

An unique situation that had confronted the 2d Battalion and at times the adjoining 1st Battalion stemmed from the large numbers of Army engineer personnel building the nonrepatriate POW camp in the DMZ immediately west of the 2/5 sector. During August and the first part of September, the area in front of 2/5 had been used as a base camp for 5,000–7,000 construction personnel. Although their area was crowded with these additional units, the Marine battalions could not exercise any control over them. The Marines were still responsible for security of the sector, however. Presence of as many as 22,000 nonrepatriate CCF and NKPA prisoners as well as the Indian custodial forces further complicated the matter. It was noted that:

At the same time the Army engineers were building the camp, the prisoners were situated in the middle of the 2/5 area and the MSR to Panmunjom led completely across the battalion position into the 1/5 sector [and thence] into the DMZ. Upon completion of the camp, the engineers withdrew from the area but as they withdrew the 5,500 troops of the Custodial Forces India were brought in to guard the nonrepatriate prisoners. With the arrival of the prisoners, the number of personnel in the regiment’s sector of responsibility rose to 28,000–30,000. Thus, the problem of having a GOP mission and at the same time having never less than 5,000 and as many as 30,000 friendly, neutral, and/or prisoner personnel in front of our most forward defended localities was always present.[678]

[678] 5thMar Hist, pp. 6–7, Folder #3.

Camp construction and development of the new positions south of the river continued at a furious pace from August through early October. Since the new camp sites were in civilian populated areas, “it was necessary to secure real estate clearance before they could be occupied or improved.”[679] After clearance was obtained on 29 July, division engineers immediately began work on five separate camps. These camp building activities and reconnaissance of assigned blocking positions continued until 10 August. At this time, construction began on the major blocking positions, so organized and developed as to be self-sustaining for several days. Whether squad, platoon, or company, all positions were organized using a perimeter type defense and were mutually supporting laterally and in depth. Connecting trenches, bunkers, ammunition holes, and tank slots were also built.

[679] 1st EngrBn Rpt, Operations during 27 Jul-31 Oct 53, dtd 19 Apr 53, p. 4, Folder #6.

By early October, construction of the blocking positions was completed by the 1st Marines despite the fierce summer heat, the numerous rock formations in the area that were difficult to dig out with limited tools and demolitions, and the shortage of personnel due to units participating in the new series of division MARLEX exercises, resumed in October. Within three months, the Marine division had thus largely completed building of a solid defense in its new main battle position. The importance of maintaining combat readiness for any renewed hostility on the part of the enemy demanded continuing vigilance at all times.

Defense specifications throughout the 5th Marines northern general outpost sector called for some 1,560 individual fighting positions, 400 automatic weapons sites, 8 bunkered infantry OPs, 30 bunkered CPs, 15,400 yards of trenchlines, and 70,000 yards of protective and tactical wire. In construction of the MBP, all bunkers were so blended and camouflaged with the natural terrain that they were almost impossible to be seen.

To the division rear, the location of recoilless rifle positions, FDC bunkers, and tank slots in the blocking positions and bridgeheads was the major priority. In the antimechanized defense plan, tanks covered likely avenues of approach into the general outpost area and also overlooked critical river crossing sites. Wherever possible old firing positions which had been previously prepared to support the secondary lines WYOMING and KANSAS were utilized. By the end of the year, 204 tank firing positions had been emplaced throughout the Marine division sector.

Three rehearsals for the occupation of the main battle position were held by the 1st Marine Division in September. All division units, both combat and service, participated in these exercises. Tactical units were required to occupy the MBP and be fully prepared for combat on four hours’ notice; service units were to provide additional local security required for the elimination of enemy infiltrators or guerrilla agents. Divisional and I Corps test exercises indicated that three hours were necessary to man the MBP during daylight and approximately three and one half hours at night.

_Postwar Employment of Marine Units in_ FECOM[680]

[680] Unless otherwise noted, the material in this section is derived from: _PacFlt EvalRpt_ No. 6, Chap. 10; AnlRpt CMC to SecNav for FY 1954, dtd 11 Aug 54; AnlRpt CMC to SecNav for FY 1955, dtd 15 Aug 55; 1st MAW ComdDs, Aug-Sep 53; MAGs-12, -33 ComdDs, Aug-Sep 53; MSgt Roy E. Heinecke, “Four Star Visit,” _Leatherneck_, v. 37, no. 1 (Jan 54).

The 1st Marine Aircraft Wing Post-Armistice Plan, as part of Fifth Air Force operations, was effective at 2200, on 27 July. Its purpose, basically, was to insure that wing elements carried out provisions of the armistice and yet continued to maintain a high level of combat readiness in the uneasy truce period.

Two major operational restrictions had been imposed on the UNC air force by the armistice. The first was establishment of the “No-Fly Line” south of the Allied southern boundary of the DMZ. Any flight beyond that point had to be authorized by JOC and a barrier patrol was maintained by FAF to apprehend any violators of the truce provisions. The 1st MAW contribution to this aerial security team was night patrols performed by F3D-2s from VMF(N)-513 and radar-configured AD aircraft from VMC-1 (later, by the new VMA-251 squadron).

The second post-truce restriction, which affected wing logistic movements, limited the entry and departure of all Korean air traffic to five airfields. These aerial ports were K-2, K-8, K-9, K-14, and K-18. (K-16 was later added.) Neither K-3, the east coast home field of MAG-33 nor K-6, located just inland from the west coast and the site of MAG-12 operations, was included. All Marine traffic landed either at K-9 or K-2 for inventory, a procedure which subsequently developed into a bottleneck, and caused supply delays due to the substantial reduction in payload made to accommodate the necessary extra fuel due to greater overland distances between airfields. When the CG, 1st MAW requested that K-3 be made a port of entry to avoid the difficulties involved in use of the two FAF fields, ComNavFE disapproved the request with the following rationale:

ComNavFE feels that to ask for designation of K-3 as an additional port of entry would be politically inadvisable. It would provide the Communists with a basis for a propaganda claim that the United Nations were attempting to further delay an armistice agreement. Should the Communists propose an additional port of entry for their side, COMNAVFE states the UN Military Armistice Commission will offer designation of K-3 as a _quid pro quo_.[681]

[681] _PacFlt EvalRpt_, No. 6, p. 10-74.

Removal from Korea to Japan of operational combat aircraft for routine maintenance runs and their return thus had to be made through the same port of exit and reentry. Inspections were conducted by the USAF combat aircraft control officer at the port.

The post-truce 1st MAW mission, in part, comprised the following:

... to maintain assigned forces in a state of combat readiness, provide for security of assigned forces, areas, and installations; observe the conditions of the Armistice Agreement; support other elements of the United Nations Command as required; be prepared to counter any attempt on the part of the enemy to resume active hostilities; continue current missions other than combat; insure that 1st MAW personnel and combat material are not increased beyond the level present at the instant of the effective time of the Armistice Agreement; submit reports on 1st MAW personnel and controlled items of Wing equipment entering or leaving Korea; be prepared to disperse air units within or from Korea as necessary to provide maximum security during an Armistice....[682]

[682] 1st MAW ComdD, Aug 53, Folder #1, p. 1.

The strict interpretation of replacing combat aircraft, armored vehicles, weapons, and ammunition that were destroyed, worn out, or used up during the period of armistice was, of course, due to the sensitive political considerations. It was felt that replacement of combat equipment by UNC forces:

... would result in the Communists adopting the same liberal interpretation which is undesirable since it will lessen the control of combat material in North Korea and could permit them to replace phenomenal unauthorized quantities of material damaged, destroyed, worn out or used up prior to the effective date of the Armistice Agreement.[683]

[683] 1st MAW ComdD, Aug 53, Folder #2, msg ComNavFE to all units, dtd 16 Aug 53.

In August, postwar procedures were mapped out for 1st MAW personnel, as part of the overall quota limitations prescribed by FECOM (Far East Command) through FEAF and FAF echelons. A 1st MAW headquarters section, designated as 1st MAW, rear echelon, was established at Itami AFB, Japan, two hours’ flight from Korea. All incoming or outgoing aviation personnel on permanent change of station orders were to report to the rear echelon, 1st MAW. Announcement of Marine Corps plans to initiate future postwar rotation on a stretch-out basis (for both air and ground personnel) was also made in August. Preliminary plans called for changing the current 11-month combat tour in Korea to 14 months by March 1954, and possibly 16-month tours by July 1954, if extension of Korean service proved necessary. As with division personnel, monthly cumulative arrivals were not to exceed the number of departing aviation Marines. The quota set by FEAF for 1st MAW rotation for the month of August was 600, compared to the Marine division quota of 3,000 for ground personnel.

With the 1st Marine Division engaged for an unknown length of time in its postwar mission as an occupation force and 1st MAW units continuing to operate under FAF in Korea, new Marine ground and air units were assigned to the Far East theater shortly after the conclusion of Korean hostilities. On 23 July, the 3d Marine Division, together with supporting air units, was readied for deployment from Camp Pendleton to Japan the following month. On 13 August the division CP was opened afloat and units proceeded to Japan between 16–30 August. The mission of this division and the two major air units, MAGs-11 and -16, was to maintain a high state of readiness in the Far East Command and to assist in the air defense of Japan. As explained by the Commandant, their redeployment was accomplished “in order to provide the amphibious capability which is an important element of national strategy in that predominantly maritime theater.”[684]

[684] AnlRpt CMC to SecNav for FY 1954, dtd 11 Aug. 54, p. II-2.

The new Marine units thus joined in the Pacific, the 1st Provisional Marine Air-Ground Task Force[685] that had been activated in Kaneohe, Hawaii in January of 1953. Commanded by Brigadier General James P. Risely, it was to include a headquarters company, reinforced regiment, and reinforced aircraft group. The special task force was designated as a hard-hitting, air-ground team that could respond immediately as a force-in-readiness to any emergency in the Pacific area.

[685] The Task Force was subsequently redesignated as the 1st Marine Brigade, FMF, in May 1956.

Commanded by Major General Robert H. Pepper, the 21,100-man 3d Marine Division was called the “Three-Dimensional Division,” in reference to its training in airborne, amphibious, and atomic warfare. Within six months, its components were to stretch from Kobe to Tokyo, with division headquarters and the 9th Marines at Gifu, the 4th Marines at Nara, and other units at Otsu.

New Marine air units, which included Marine Transport Squadron 253 and Marine Observation Squadron 2, as well as MAGs-11 and -16, all came under 1st MAW operational control. Commanded by Colonel John D. Harshberger, the all-jet MAG-11, formerly based at Edenton, N.C., arrived at NAS Atsugi on 10 September. It comprised three F9F squadrons, VMFs-222, -224, and -314. Also at Atsugi, the Marine Corps aerial gateway to Japan, was the new transport squadron, VMR-253, commanded by Lieutenant Colonel Carl J. Fleps, which reported in to CG, 1st MAW, on 16 August. Following numerous FMFPac requests for additional air transport capability, the Commandant had authorized transfer of the squadron from El Toro to assist the veteran wartime carrier VMR-152 in the enormous postwar airlift program.

Flying new R4Q Fairchild Packets, which could carry 42 troops, the squadron from August to May 1954 logged more than 5,000,000 passenger miles in transporting Marine replacements for the 1st and 3d Marine Divisions. Additional air capability was provided by Marine Helicopter Transport Group 16 (at Hanshin AFB) under Colonel Harold J. Mitchener, with its two HRS-2 (HMR-162, HMR-163) and service squadrons (MAMs-16, MABS-16) and VMO-2, commanded by Major William G. MacLean (based at Itami). Both units reported to 1st MAW and FECOM on 13 August.

Major command changes within the 1st MAW that month were: Brigadier General Verne J. McCaul, vice Brigadier General Alexander W. Kreiser, Jr. as ACG, 1st MAW, effective 16 August; and Colonel William F. Hausman, vice Colonel Carney, CO, MAG-12, on 8 August. (The new MAG-33 CO, Colonel Smith, had succeeded Colonel Stacy in late July.)

In the immediate post-armistice period, extensive training programs were instituted by MAGs-12 and -33 to maintain high operational efficiency. Marine aircraft remained on JOC alert as required by the Fifth Air Force and flew training missions scheduled by 1st MAW and FAF. These consisted of practice strikes against heavily-defended targets, practice CAS for Eighth Army units, GCI (ground control intercept) flights under MGCIS-3 control, and bombing practice using the Naktong Bombing Range. Other training sorties were scheduled in reconnaissance navigation, weather penetration, determining fuel bingos,[686] target location and identification, air defense patrolling, and coordination of tactical procedures in the target area. The training schedules provided a well-balanced indoctrination program for new squadron flight leaders, pilots, radar operators, and other crew members arriving in Korea on the postwar personnel drafts.

[686] A fuel bingo is the amount of fuel needed by a pilot to reach home base plus enough additional fuel to divert to an alternate airfield.

A new work day schedule of 0700–1500 implemented in August made more time available for athletics, swimming, studying, and R&R (Rest & Recreation). That same month the MAG-12 softball team won the Fifth Air Force “All Korea” softball championship. Following this achievement, the team left for Japan to compete in the FAF “Far East” softball tournament which included teams from all the major Pacific bases. Subsequently, the K-6 players “disguised in Air Force uniforms, went onward and upward to become FEAF champions in September.”[687] MAG-33 pilots, meanwhile, participated in Operation SPYGLASS, a FAF training exercise in August and Operation BACK DOOR, the following month. Both emphasized interception flying and work with GCI squadrons. As “aggressors,” the Pohang-based airmen made simulated attacks on South Korean targets “defended” by Air Force and other land-based Marine units. In October, MAG-33 pilots flew CAS missions for the 1st Marine Division training problem, MARLEX IV, a battalion landing exercise staged by 1/7 on Tokchok-to Island. Beginning that month a new procedure was inaugurated by MAG-33 and the recently-arrived MAG-11. Every week, four MAG-11 pilots came to Korea for a week of orientation flying with a MAG-33 squadron to gain a better picture of typical flying conditions in the Korean theater.

[687] Field, _NavOps, Korea_, pp. 456–457.

Early in 1955 the 1st Marine Division, which had been in the Korean front lines almost continuously since September 1950, returned to Camp Pendleton. Redeployment by echelons began in February. By June, all units had returned to CONUS. The transfer from Korean occupation duty was effected in order that the division’s “valuable capability as a highly trained amphibious force in readiness may be fully realized.”[688] Now under Major General Merrill B. Twining,[689] the division had been a part of Eighth Army occupying postwar defense positions in Korea until its relief on 17–18 March 1955 by the U.S. 24th Infantry Division.

[688] AnlRpt of CMC to SecNav FY 1955, dtd 15 Aug 55, p. 3, quoting statement made by SecDef in Dec 54 on forthcoming departure of 1stMarDiv from FECOM.

[689] Postwar commanders of 1stMarDiv to date had been Major General Robert H. Pepper, who succeeded General Pate, and served from 12 May 54–22 Jul 54; Major General Robert E. Hogaboom, 23 Jul 54–17 Jan 55; and General Twining, beginning 18 Jan 55.

In addition to its official mission in the Eighth Army line, the 1st Marine Division had conducted an active small-unit amphibious training program during its postwar Korea duty. All but two of its infantry battalions had carried out assault landings on Tokchok-to, off the Korean west coast south of Inchon, prior to its departure for the United States. The 3d Marine Division had also conducted an active training program, with numerous small-unit exercises and regimental landings staged at Iwo Jima and Okinawa as part of its continuous readiness conditioning.

For Marine air personnel, their official departure from Korea following the 1st MAW wartime assignment there, came the next year. Beginning in June 1956, initial units of the Marine aircraft wing were withdrawn from Korea and relocated at NAS Iwakuni, Japan. Plans called for the wing, then under Brigadier General Samuel S. Jack[690] and occupying bases in both Korea and Japan, to be permanently headquartered at Iwakuni and revert to CinCPacFlt control. The wing remained on station in the Far East as a component of postwar United States defense strength in that area.

[690] CGs, 1st MAW, in the immediate post-armistice period were: Major General Megee, until 4 Dec 53; Major General Albert D. Cooley, 5 Dec 53–25 Mar 54; Brigadier General McCaul, 26 May 54–24 Aug 54; Brigadier General Marion L. Dawson, 25 Aug 54–24 Sep 55; and Brigadier General Jack, 25 Sep 55–30 Jun 56.

The prewar Fifth Air Force and Eighth U.S. Army commands, under which Marine Corps air and ground units had functioned during the Korean War, were permanently deployed in the Far East as operative military echelons. EUSAK-FAF transferred from its wartime JOC location at Seoul to Osan-ni in January 1954 and in September of that year relocated to Nagoya, Japan. Eighth Army headquarters remained at Seoul.