U.S. Marine Operations in Korea, 1950-1953, Volume 4 (of 5) The East-Central Front
CHAPTER X
The New Warfare of Position
_Sectors of Major_ EUSAK _Units--Statement by General Van Fleet--Hill 854 Secured by 3/1--Helicopter Troop Lift to Hill 884--Helicopter Operation_ BLACKBIRD--_“To Organize, Construct, and Defend”--Marine Operations of November 1951--The Second Marine Christmas in Korea_
Two and a half weeks of hard fighting had taken place along the X Corps front when General James A. Van Fleet paid a visit on 16 September 1951. The commanding general of EUSAK wished to inspect the operations and determine the morale of the 1st Marine Division and 2d Infantry Division, both of which had suffered heavy casualties. He found the morale of these X Corps units good and had no adverse criticisms of their operations. While on this tour of inspection, however, he issued the following three directives to X Corps:
(1) That replacements would be integrated into units only when the battalion or larger-sized unit to which they were assigned was in reserve;
(2) that certain ‘choke points’ [General Van Fleet pointed out the locations on the map] be interdicted to prevent enemy reinforcements or withdrawals through these points;
(3) _that the Corps Commander firm up his line by 20 September and to plan no further offensives after that date_, as it was unprofitable to continue the bitter operation.[294]
[294] EUSAK _Cmd Rpt_, Sep 51, 47. Other sources for this chapter are comments and criticisms by the following officers, all but one of whom are U.S. Marines. Ranks in each instance are those held at the time of interview or correspondence.
General J. A. Van Fleet, USA (Ret.); General G. C. Thomas, Lieutenant General J. T. Selden; Brigadier Generals V. H. Krulak, S. S. Wade, R. G. Weede; Colonels G. P. Groves, B. T. Hemphill, K. L. McCutcheon, J. H. Tinsley, F. B. Nihart, G. D. Gayle, W. P. Mitchell, J. F. Stamm, F. P. Hager, Jr.; Lieutenant Colonels H. W. Edwards, J. G. Kelly; Major R. L. Autry.
Italics have been added to emphasize the importance of 20 September 1951 as the turning point when a warfare of position replaced a warfare of movement throughout the remaining 22 months of the conflict in Korea. There are few dates as important in the entire history of the war.
General Van Fleet reiterated his instructions on the 18th in a confirming directive to the effect that X Corps continue making limited attacks “until 20 September, after which ... units were to firm up the existing line and to patrol vigorously forward of it.”[295]
[295] EUSAK _Cmd Rpt_, Sep 51, 53.
_Sectors of Major_ EUSAK _Units_
At this turning point the Eighth Army had 14 divisions from four corps committed along a 125-mile front across the peninsula. These units were distributed (Map 19) as follows:
U.S. I CORPS
_ROK 1st Division_ holding the left anchor in the Munsan-ni area and controlling the 5th KMC Battalion on the Kimpo Peninsula;
_British 1st Commonwealth Division_ across the river Imjin to the northeast;
_U.S. 1st Cavalry Division_ (Greek and Thai Battalions attached) still farther to the northeast in the Yonchon area;
_U.S. 3rd Infantry Division_ (Belgian Battalion and Philippine 20th BCT attached) having the responsibility for the vital Chorwon area;
U.S. IX CORPS
_U.S. 25th Infantry Division_ (Turkish Brigade attached) defending the area west of Kumhwa;
_ROK 2d Division_ holding a sector east of Kumhwa;
_U.S. 7th Infantry Division_ (Ethiopian Battalion attached) on the right;
_ROK 6th Division_ with a narrow sector as far east as the Pukhan River, the Corps boundary;
_U.S. 24th Infantry Division_ (Colombian Battalion attached) in Corps reserve south of Hwachon;
U.S. X CORPS
_ROK 8th Division_ on the left flank;
_U.S. 2d Infantry Division_ (French and Netherlands Battalions attached) in left-central portion of Corps front;
_ROK 5th Division_ occupying a narrow sector to the east;
_U.S. 1st Marine Division_ holding eastern portion of the Corps sector;
ROK I CORPS
_ROK 11th Division_ responsible for left of the Corps front;
_ROK Capitol Division_ holding the line eastward to the Sea of Japan;
_ROK 3d Division_ in reserve at Yangyang for a period of training.[296]
[296] EUSAK _Cmd Rpt_, Oct 31, 5–6 and Plate 1; 1stMarDiv _HD_, Sep 51, 3.
Some rather complicated juggling of units took place on the X Corps front, giving the effect of a game of musical chairs in the tactical sphere. From 18 to 21 September the 1st Marine Division extended its line eastward to relieve the 8th ROK Division on the extreme right of the Corps area. That Division in turn relieved the 5th ROK Division on the extreme left, whereupon the latter leapfrogged the 2d Infantry Division to occupy a new sector on the left of the Marines.
_Statement by General Van Fleet_
“Theirs not to reason why” could never have been written about American fighting men. From 1775 to the present day, they have always taken a keen interest in the high-level strategic and tactical decisions governing their operations. This applies with particular force to the Marines, who have seldom had a voice in the shaping of operations above the division level.
As if in direct reply to unspoken questions, the commanding general of the Eighth Army made a statement on 30 September explaining the purpose of his strategy. “My basic mission during the past four months,” he said, “has been to destroy the enemy, so that the men of Eighth Army will not be destroyed.... Each loaded enemy weapon was a definite threat to the Eighth Army. It was imperative that we knock out as many of those weapons as we could find....”
“In prodding the enemy in the deep belly of the peninsula,” continued General Van Fleet, “we have taken many casualties.... It was mandatory that we control the high ground features, so that we could look down the throat of the enemy and thereby better perform our task of destruction.... In seizing these hills we lost men, but in losing a comparative few we saved other thousands.”
Estimated casualties, inflicted on the enemy by UN ground forces alone from 25 May to 25 September, were announced as 188,237 by the EUSAK commander. “As we open our autumn campaign,” he added, “the enemy potential along the front line has been sharply reduced by our hill-hopping tactics. The Communist forces in Korea are not liquidated but they are badly crippled.”[297]
[297] _Ibid._, 29–30.
Even so, EUSAK G-2 summaries credited the enemy on 1 October 1951 with more than 600,000 troops at the front, or in reserve and available as immediate reinforcements. Six CCF armies and one NKPA corps were capable of reinforcing the units on the MLR or participating in an offensive. The enemy also had an estimated 7,000 men in guerrilla forces behind the UN lines.[298]
[298] _Ibid._, 7–9 and Plate No. 4.
The maximum strength of UN forces in Korea during October was 607,300. This total included 236,871 U.S. Army troops, 21,020 Fifth Air Force personnel, 30,913 U.S. Marines (including 5,386 officers and men of the 1st Marine Aircraft Wing), 286,000 men in ROK units, and 32,172 Allied troops.[299]
[299] _Ibid._, 5–6, and Plate No. 1.
Although it might appear that the opposing forces were about equal, it must be remembered that well over one-fourth of the UN troops were engaged in administrative or maintenance duties behind the front. Thus the Communists had a numerical advantage of at least four to three on the firing line. This was not at all unusual, since they had enjoyed a preponderance in manpower from the beginning.
_Hill 854 Secured by 3/1_
In accordance with EUSAK instructions, X Corps OI-235 directed the 1st Marine Division to organize and construct defensive positions after relieving the 8th ROK Division on the right and taking over its sector. On the Corps boundary, elements of the 11th ROK Division, I ROK Corps, were to be relieved on Hill 884 (Map 20). This meant the addition of some 9,000 yards to the Marine front, making a total of about 22,800 yards or more than 13 miles.
First Marine Division OpnO 27-51, issued on 18 September, relayed the X Corps directions. It also called for such offensive action as might be necessary to complete the securing of Hill 854, in the sector of the 8th ROK Division, if not in friendly hands at the time of the relief.[300]
[300] 1stMarDiv _HD_, Sep 51, 3.
That the enemy had put up a desperate fight to hold this position is indicated by the EUSAK report for 15–16 September: “The ROK 8th Division, employing all three regiments, attacked against heavy and stubborn resistance to wrest Hill 854 from the three battalions of North Koreans who held the position. The ROK 21st Regiment forced one of these battalions to withdraw and occupied a part of the hill, but at the close of the day were engaged in heavy hand-to-hand fighting to retain the position.”[301]
[301] EUSAK _Cmd Rpt_, Sep 51, 47.
On 20 September, after three weeks of continual combat, the major units of the 1st Marine Division were disposed from left to right (Map 20) as follows:
1st KMC Regiment (Colonel Kim Dae Shik, commanding; Colonel Walter N. Flournoy, senior adviser) occupying the HAYS line on the left flank and patrolling vigorously to the north;
5th Marines (Colonel Richard G. Weede) holding a wide sector in the center, with Hill 812 as the principal terrain feature;
1st Marines (Colonel Thomas A. Wornham) in process of extending eastward to the Corps boundary just beyond Hill 884;
7th Marines (Lieutenant Colonel John J. Wermuth) in Division reserve at Wontong-ni.[302]
[302] 1stMarDiv _HD_, Sep 51, 3–4, 18–22.
Division OpnO 27-51 designated the 1st Marines to relieve the ROKs on Hill 854 and complete the seizure of that terrain feature, if necessary. As a preliminary, the 1st Battalion of the 5th Marines (Lieutenant Colonel William P. Alston) took over the front of the 1st Marines on the HAYS line. This enabled 1/1 and 3/1 to enlarge the Division sector by side-slipping to the east while Lieutenant Colonel Franklin B. Nihart’s 2/1 went into immediate reserve just behind the main line of resistance.[303]
[303] The balance of this section is based on the 1stMarDiv _HD_, Sep 51, 18–24, and on 1/1 and 3/1 _HD_, Sep 51.
The 1st Battalion of the 1st Marines (Lieutenant Colonel John E. Gorman) relieved two battalions of the 10th ROK Regiment in the Hill 854 area. No opposition from the enemy was encountered, but the Marines suffered 11 casualties from mines as a consequence of incorrect charts supplied by the ROKs.
By this time it had become an open question whether “friendly” mines did more harm to friend or foe. Certain it was, at any rate, that the prevailing system--or lack of system--resulted in Marine casualties during nearly every offensive operation in zones where the action shifted back and forth.
Lieutenant Colonel Foster C. La Hue’s 3/1 relieved two battalions of the 21st ROK Regiment. Although the ROKs had fought their way to the summit of Hill 854, the ridgeline to the southwest remained in the enemy’s hands. An attack by 3/1 was planned for 1530 on 20 September, supported by artillery and an air strike. Delays in the arrival of the planes caused a postponement until 1720. How Company jumped off and had advanced 50 yards when a man was killed and another wounded by mines. The attack was called off at dusk so that the ROKs could remove the explosives they had planted.
Air support was requested for 0700 on the morning of the 21st, but it was 1040 before four Air Force F-51s arrived for a strike directed by an observation plane of VMO-6 and a forward air controller. At 1220, following a 10-minute artillery preparation, How Company spearpointed a battalion attack which met stiff resistance. Another air strike was requested but did not materialize. The assault continued with mortar and artillery support until 1745, when How Company reported the ridge line secured.
Casualties of 3/1 for the two days were nine KIA and 55 WIA. Enemy losses totaled 159 counted and 150 estimated KIA, 225 estimated WIA, and 29 prisoners.[304]
[304] Sources for the action on Hill 854 are the 1/1 and 3/1 historical diaries for September 1951.
“A large number of mines and booby traps were discovered within the battalion sector,” the 3/1 report for the 23d concluded, “most of these being U.S. types which were placed by ROK troops, with only a few enemy mines scattered in the central portion of the sector.”[305]
[305] 3/1 _HD_, Sep 51, 8.
_Helicopter Troop Lift to Hill 884_
Division OpnO 27-51, it may be recalled, had directed the Marines to extend the X Corps boundary eastward by taking over the sector of the 11th Regiment, I ROK Corps. Even under ordinary circumstances this would have meant an exhausting 15-hour march for the relieving troops merely to climb Hill 884 (Map 20), The position was accessible only on foot, and supplies had to be brought on the backs of cargadores.
Because of the isolation of this wildly mountainous area, a reconnaissance was deemed essential. Major General Gerald C. Thomas, commanding general of the 1st Marine Division, assigned that mission to the Division Reconnaissance Company after deciding on a troop lift by helicopter.
He was aware, of course, that no such operation had ever been undertaken during the brief history of rotary-wing aircraft. Large-scale helicopter troop lifts were still at the theoretical stage.
Lieutenant Colonel George W. Herring, commanding officer of HMR-101, had but 48 hours for preparation. He and his executive officer, Lieutenant Colonel William P. Mitchell, worked out a tactical and loading plan with the commanding officer of Recon Company, Major Ephraim Kirby-Smith, and the acting Division Embarkation Officer, First Lieutenant Richard C. Higgs.[306]
[306] Sources for this section, unless otherwise specified, are the following: DivReconCo _HD_, 1stShorePartyBn _HD_, HMR-161 _HD_, Sep 51; Type “C” Spec Rpt, “Employment of Assault Helicopters,” 7–13; _Cavalry of the Sky_, 162–165.
An air reconnaissance of Hill 884 disclosed only two acceptable locations for landing sites, both approximately 50 feet square with a sheer drop on two sides. About 100 yards apart and some 300 feet below the topographical crest, each could be cleared sufficiently for the landing of a single aircraft.
Major Kirby-Smith decided on the order in which troops of his company and attached units would be landed. The assignment and loading tables were completed on 20 September in time for a rehearsal. All participants were instructed as to their team numbers and embarkation points.
H-Hour of Operation SUMMIT (Map 21) was set for 1000 on 21 September. The plan called for a preliminary landing of a Recon Company rifle squad to provide security. Next, a landing point team from the 1st Shore Party Battalion (Lieutenant Colonel Harry W. Edwards) had the mission of clearing the two sites. These two groups were to disembark from hovering helicopters by means of knotted 30-foot ropes. Strong winds at the 2,900-foot altitude made landing quite hazardous.
The execution was delayed half an hour by the ground fog so prevalent at this time of year. As soon as the two landing sites were cleared (about 40 minutes), word was transmitted by radio for the loading to begin at Field X-83 (Map 21), about 14 miles southwest of Hill 884 by the defiladed route of flight.
Control over the landings and takeoffs on the two Hill 884 sites was exercised by a hovering helicopter. Aircraft landed at 30-second intervals, each carrying five fully equipped men who disembarked in average time of 20 seconds. Two radio nets maintained communications between the landing sites and orbiting aircraft. Voice contact could not be established between the landing point team and X-83, however, and it became necessary for a helicopter to return within sight of the field to restore communications for incoming aircraft.
A total of 224 men, including a heavy machine gun platoon from 2/7, was lifted in flight time of 31.2 hours and over-all time of four hours. In addition, 17,772 pounds of cargo were landed.
Operation SUMMIT ended with the laying of two telephone lines between Recon Company on Hill 884 and the CP of the 1st Marines, about eight miles to the rear. Fifteen minutes were required for dropping each line. The ROKs, following their relief, proceeded on foot to their own Corps area.
From a tactical viewpoint, the importance of Hill 884 lay in its domination of enemy-held terrain. The difficulty of reaching the remote position had been overcome by the helicopter, and Operation SUMMIT was recorded in front page headlines by Stateside newspapers.
Congratulations poured in from all sides. Lieutenant General Lemuel C. Shepherd, Jr., commanding general of FMFPac, complimented HMR-161 on “a bright new chapter in the employment of helicopters by Marines.” Major General Clovis E. Byers, commanding X Corps, praised the “organic and attached units of the 1st Marine Division that participated in the first relief of units on the battle position. Your imaginative experiment with this kind of transport is certain to be of lasting value to all the services.”[307]
[307] Messages of congratulation are quoted from HMR-161 _HD_, Sep 51.
Nobody was more enthusiastic than General Thomas. “Operation SUMMIT, the first helicopter-borne landing of a combat unit in history, was an outstanding success,” said his message. “To all who took part, well done!”
_Helicopter Operation_ BLACKBIRD
It is not surprising, considering their training, that the Marines found it a difficult transition from offensive to defensive operations after 20 September. As evidence that patrols were conducted with customary aggressiveness, Marine casualties (including the 1st KMC Regiment) for the last 10 days of the month were 59 KIA, 1 MIA, and 331 WIA. Enemy losses for the same period were 505 counted KIA, and 237 prisoners.
1st Marine Division casualties of 2,416 (including 594 reported by the KMCs) for September as a whole were the most severe suffered during any month of the war so far with the exception of December 1950 and June 1951. NKPA losses of the month were 2,799 counted KIA and 557 prisoners.[308]
[308] 1stMarDiv _HD_, Sep 51, 4, 31–32.
On the 23d the 1st Marines extended to the eastern boundary of X Corps and relieved the Division Reconnaissance Company on Hill 884. That same day the enemy was treated to a novelty when 100 well aimed 16-inch projectiles, fired from a range of 40,000 yards, roared in like meteors on his positions in the area of Hill 951 (Map 20). Naval gunfire from the USS _New Jersey_ was being conducted by Marine spotters in forward OPs, who reported good coverage for the 2,000-pound rounds. Ammunition dumps and artillery pieces were destroyed while NKPA troops in the open suffered heavy personnel casualties, according to observers.
Several more bombardments were contributed by the _New Jersey_ at the request of 1/1 and 3/1 during the balance of the month. Marine and attached Army artillery also gave excellent support with fire so accurate as to break up enemy counterattacks before they could be launched. Ammunition restrictions hampered the efforts of the 11th Marines (Colonel Custis Burton, Jr.) but the cannoneers never failed to respond to an emergency. The 90mm rifles of the 1st Tank Battalion (Lieutenant Colonel Holly H. Evans) continued to show good results with direct observed fire on enemy bunkers. Air support in September, concluded the Division report, was “generally inadequate and unsatisfactory.”[309]
[309] _Ibid._
By the last week of September the Division right (east) flank was well protected, considering the rugged terrain. Not as much could be said for the other flank, northwest of the Punchbowl, where the sector of the Marines joined that of the 5th ROK Division. Since the Division sector was divided by high, roadless mountains, there was no rapid way of moving reserves other than by helicopter. In short, the 1st Marine Division was hard pressed to man a 22,800-yard MLR while keeping in reserve enough troops to help defend this sensitive area in an emergency.
Plans were completed by General Thomas and the Division staff for the rapid displacement of a company from 2/1, the reserve battalion of the 1st Marines, to meet any such threat. Since a surprise attack was most likely to occur at night, it was decided that a helicopter lift of an element of the Division reserve should be made in the darkness of 27 September after a detailed daytime rehearsal.[310]
[310] The remainder of this section is based upon the Type “C” Spec Rpt, “Employment of Assault Helicopters,” Part II, 1–9; HMR-161 and 1stShorePartyBn _HD_, Sep and Oct 51; _Cavalry of the Sky_, 165–167.
In contrast to former Marine helicopters, which had no night-flying aids, the HRS-1 was equipped with few attitude of flight instruments. They were primitive compared to the sophisticated instrumentation of fixed-wing planes, and Lieutenant Colonel Herring sent his pilots on preliminary night indoctrination flights to memorize terrain features.
The route, five air miles in length, amounted to a round trip of 13 miles because of the detours necessary for purposes of concealment. The aircraft were to take off from a dry river bed southeast of Hill 702 (Map 21) and land near the northwestern rim of the Punchbowl, where the troops would march a mile to their final assembly area.
The infantry unit selected for Operation BLACKBIRD was Easy Company of 2/1, commanded by Second Lieutenant William K. Rockey. Lieutenant Colonel Nihart and Major Carl E. Walker, the battalion commander and his executive officer, supervised the daylight rehearsal on the morning of the 27th. Six helicopters lifted 200 men in the overall time of two hours and 10 minutes to a landing site of 50 by 100 feet cleared by a team of the 1st Shore Party Battalion. The troops were proceeding on foot to their assembly area when an antipersonnel mine wounded a man. Nihart called a halt immediately and investigation revealed that the area was filled with mines. Plans were changed to abandon the march, although the landing site remained the same.
Operation BLACKBIRD got under way at 1930 on 27 September. The night was dark when the first HRS-1 took off with five combat-equipped men. Three-minute intervals were required between aircraft operating on a shuttle system, so as to avoid the danger of collisions. Different altitudes were assigned to outgoing and incoming helicopters which used running lights only two minutes before entering or leaving the debarkation zone.
A total of 223 troops were landed in over-all time of two hours and 20 minutes instead of the nine hours a movement by foot would have required. Nevertheless, some of the results were not reassuring. Rotor wash blew out many of the flare pots lighting the embarkation area, and the battery-powered beach lanterns on the landing site proved inadequate. Pilots were temporarily blinded by the glare on windshields; and artillery flashes bothered them while making their way through three mountain passes. Fortunately, good radio communications aided pilots who had trouble in locating the landing site in spite of night rehearsals.
Operation BLACKBIRD remained the only night helicopter troop lift during the war in Korea. “Present equipment,” said the Marine report, “indicates that under present conditions in Korea these night lifts should be limited to movements within friendly territory.”[311]
[311] Type “C” Spec Rpt, “The Employment of Assault Helicopters,” Part II, 4.
“_To Organize, Construct and Defend_”
“The Division continued to organize, construct and defend positions along a 13½-mile front; patrol forward of the MLR and screen rear areas; and maintain one U.S. Marine regiment which could not be committed without authority from X Corps in a reserve area 17 miles behind the lines.”
The above quotation, from the opening paragraph of the report of the 1st Marine Division for October 1951, sums up in a nutshell the new trend of operations since 20 September. It is significant that for the first time in 1951 the Division Historical Diary departs from a daily account of events and divides the month into two equal parts for a chronicle of operations. Not enough had happened to justify a day-by-day summary.
This does not mean that the Marines neglected any opportunity to do the enemy hurt. It means only that the opportunities of defensive warfare were limited as compared to the preceding six months of offensive operations. That the Marines made the best of such opportunities is shown by the fact that the ratio of enemy to friendly casualties increased from the 4-to-1 of September to the 20-to-1 of October, even though the totals of the former month were larger.[312]
[312] 1stMarDiv _HD_, Oct 51, 1–3.
As a result of his new defensive policies, the enemy often avoided a fight. Day after day passed during the first two weeks of October without far-ranging Marine patrols being able to make contact.
Line MINNESOTA, the new MLR (Map 20), ran roughly parallel to the hays line but included advanced positions taken in the September offensive. During the first 10 days of October the 2d Battalion of the 1st Marines continued to be the Division forward reserve in readiness for a quick shift to any threatened point in the MLR, and the Division Reconnaissance Company had the mission of maintaining daily contact with the 11th ROK Division on the Marines’ right flank.
It might seem that the 7th Marines, 17 miles to the rear at Wontong-ni, would be entirely becalmed. Yet this regiment saw as much action on some days as any of the three regiments ranging forward of the MLR. The explanation was that the rear area was infested with elusive North Korean guerrillas who kept the 7th Marines patrols busy.
Early in October the question arose as to how quickly a reserve battalion could be shifted from one point to another. By this time a company-size helicopter lift had become commonplace, having been successfully completed twice by HMR-161 since Operation SUMMIT. It remained to be seen whether a battalion could be transported with comparable celerity, and, on 9 October, Division issued an order warning of 3/7’s move.
The 7th Marines was due to exchange places with the 5th Marines on the 11th after relieving that regiment in the center of the Division front. While 1/7 and 2/7 completed a conventional relief of their opposite numbers, 3/7 was selected for a helicopter lift. Lieutenant Colonel Edwards, the new commanding officer, had recently commanded the Shore Party Battalion and helped to train its landing site and loading point teams. He took part in the planning along with Colonel Krulak, Lieutenant Colonels Herring and Mitchell, and the new commanding officer of the Shore Party Battalion, Lieutenant Colonel George G. Pafford.
Planning went on as if for an amphibious operation. Assignment and loading tables were worked out, and each Marine of the six-man embarkation teams had his designated place in the helicopter. On 10 October all officers and men of 3/7 attended a familiarization class at which trial teams were loaded.
Operation BUMBLEBEE began at 1000 on the 11th. Field X-77 (Map 21) had been selected as the loading zone because of its proximity to the assembly area of the 7th Marines. The landing site was just behind the 5th Marines MLR, northeast of Hill 702. A flight path of 15 miles took advantage of the concealment afforded by valleys and defiladed areas.
The two dispatchers in the loading zone were provided with a checkoff flight list containing the names of every team of 3/7. In order to avoid delays, replacements could be summoned from a casual pool to fill understrength teams to plane capacity. Average time for loading was 20 seconds.
Ten to 12 minutes were required for the flight. As the helicopters landed at intervals of a minute, a team could exit and allow the craft to be airborne in an average time of 17 seconds. “Time was saved,” according to one Marine report, “when the Shore Party personnel, after opening the door, vigorously assisted the passengers by grasping their arms and starting them away from the craft. The last man out checked to see if any gear had been forgotten. Guides furnished by the battalion directed the passengers toward their respective company assembly areas, thus keeping the landing areas clear at all times.”[313]
[313] Type “C” Spec Rpt, “Employment of Assault Helicopters,”