Scientific American Supplement, No. 520, December 19, 1885

Chapter 4

Chapter 42,959 wordsPublic domain

Using the gold salt in this way, the principal difficulty experienced in holding gold wire unflinchingly in the exact position vanishes, while only a comparatively low temperature and small amount of gold is necessary. Care must be taken to withdraw the platinum from the flame just at the moment the gold is seen to run, for if the heat be continued longer, the gold alloys with a larger surface of platinum, spreads, and leaves the aperture empty. As in the case of all gold-soldered vessels, the article cannot afterward be safely exposed to a temperature higher than that at which the soldering was effected, and on this account it is advisable to use as small an amount of auric chloride as possible. When the perforations are of comparatively large size, the repairing is not so easy, owing to the auric chloride, on fusing, refusing to fill them. I find, however, that if some spongy platinum be mixed with a few milligrammes of the gold salt, pressed into the perforation, and heat applied as directed, a very good soldering can be effected. It is well to hammer the surface of the platinum while hot, so as to secure perfect union and welding of the two surfaces. This may be done in a few minutes in such a manner as to render the repair indistinguishable. Strips of platinum may be joined together in much the same way as already described--a few crystals of auric chloride placed on each clean surface and gently heated till nearly black, then bound together and further heated for a few moments in the blowpipe flame. Rings and tubes can also be formed on a mandrel, and soldered in the same fashion, and the chemist thus enabled to build up small pieces of apparatus from sheet platinum in the laboratory.--_Chem. News._

* * * * *

THE HELICOIDAL OR WIRE STONE SAW.

The sides of solid bodies, whatever be the degree of hardness, and however fine the texture, possess surfaces formed of a succession of projections and depressions. When two bodies are in contact, these projections and indentations fit into one another, and the adherence that results is proportional to the degree of roughness of the surfaces. If, by a more or less energetic mechanical action, we move one of the bodies with respect to the other, we shall produce, according as the action overcomes cohesion, more or less disintegration of the bodies. The resulting wear in each of them will evidently be inversely proportional to its hardness and the nature of its surface; and it will vary, besides, with the pressure exerted between the surfaces and the velocity of the mechanical action. We may say, then, that the wear resulting from rubbing two bodies against each other is a function of their degree of hardness, of the extent and state of their surface, of the pressure, of the velocity, and of the time.

According as these factors are varied in a sense favorable or unfavorable to their proper action, we obtain variations in the final erosion. Thus, in rubbing together two bodies of different hardness and nature of surface, we obtain a wear inversely proportional to the hardness and state of polish of their surfaces. Through the interposition of a pulverized hard body we can still further accelerate such wear, as a consequence of the rapid renewal of the disintegrating element.

The gradual wear effected over the entire surface of a body brings about a polish, while that effected along a line or at some one point determines a cleavage or an aperture.

The process usually employed in quarries or stone-yards for sawing consists in slowly moving a stone-saw backward and forward, either by hand or machinery, and with scarcely any pressure. Mr. P. Gray has, however, devised a new process, which is based upon the theoretical considerations given above. His _helicoidal saw_ is, in reality, an endless cable formed by twisting together three steel wires in such a way as to give the spirals quite an elongated pitch.

The apparatus in its form for cutting blocks of stone into large slabs (Figs. 1, 2, and 3) consists of two frames, A A, five feet apart, each formed of two iron columns, 7½ feet in height and one foot apart, fixed to cast iron bases resting upon masonry. At the upper part, a frame, B B, formed of double T-irons cross-braced here and there, supports a transmission composed of gearwheels, R R, and a pitch-chain, G G. Along the columns of the frame, which serve as guides, move two kinds of pulley-carriers, C C. The pulleys, D D, are channeled, and receive the cable, a a, which serves as a helicoidal saw. The direction of the saw's motion is indicated by the arrow. The carriages, C C, are traversed by screws, V V, which are fixed between the columns. The extremity, v, of the axle of the pulley to the right is threaded, and actuates a helicoidal wheel, E, which transmits motion to the wheel, R, through the intermedium of the vertical shaft, F. This transmission, completed by the wheels, R R, and the pitch-chains, G G, is designed to move the saw vertically, through the simultaneous shifting of the carriages, C C. A tension weight, P, through the intermedium of pulleys, D_{1} D_{1}, permits of keeping the saw taut. A reservoir, H, at the upper part of the frame, B B, contains the water and sand necessary for sawing. The feeding is effected by means of a rubber tube, I, terminating in a flattened rose, J, which is situated over the aperture made by the saw. A small pump, L. over the reservoir takes water from K, and raises it to H. The sand is put in by hand.

Above the basin, K, a system of rails and ties supports the carriage, Q, upon which is placed the block of stone to be sawn. When one operation has been finished, and it is desired to begin another, it is necessary to raise the pulley-carriers and the saw. In order to do this quickly, there is provided a special transmission, M, which is actuated by hand, through a winch.

The work done by this saw is effected more rapidly than by the ordinary processes, and certain very hard rocks, usually regarded as almost intractable, can be sawed at the rate of from one to one and a half inches per hour.

For sawing marble into slabs of all thicknesses, the arrangement described above may be replaced by a system consisting of two drums having several channels to receive as many saws, or two corresponding series of channeled pulleys, b b (Fig. 4), independent of each other, but keyed to the same axles, i i. When the pulleys have been properly spaced by means of keys, the whole affair is rendered solid by a bolt, g. The extremity of the axles forms a nut into which pass vertical screws, c c. These latter are connected above with cone-wheels, l l, which, gearing with bevel wheels keyed to the shafts, e, secure a complete interdependence of the whole. The ascending motion, which is controlled by the endless screws, f, and the helicoidal wheels, m, is in this way effected with great regularity. Uprights, a a, of double T-iron, fixed to joists, k k, and connected and braced by pieces, d d, form a strong frame.

The power necessary to run this kind of saw is less than _n_ × ¼ H.P., on account of the number of passive parts. The most interesting application of the helicoidal saw is in the exploitation of quarries. Fig. 5 represents a Belgian marble quarry which is being worked by Mr. Gay's method.

_Tubular Perforators_.--Mr. Gay has rendered his saw completer by the invention of a tubular perforator for drilling the preliminary well. It is based upon the same principle as the Leschot rotary drill, but differs from that in its extremity being simply of tempered steel instead of being set with black diamonds. A special product, called metallic agglomerate, is used instead of sand for hastening the work.

The apparatus, Fig. 6, consists of an iron plate cylinder, A, 27½ inches in diameter, and of variable length, according to the depth to be obtained, and terminating beneath in a steel head, B, of greater thickness. This cylinder is traversed by a shaft, C, to which it is keyed, and which passes through the center of the aperture drilled. This shaft is connected with the cylinder, A, through the intermedium of cross bars, D, and transmits thereto a rapid rotary motion, which is received at the upper part from a telodynamic wire that passes through the channel of the horizontal pulley, P. This latter is supported by a frame consisting of three uprights, Q Q, strengthened by stays, R R, fixed to the ground.

In order that the cylinder, A, may be given a vertical motion, cords, M M, fixed to a piece, S, loose on the hub, D, wind round the drum of a windlass, T, after passing over the pulleys, p p.

The rapid gyratory motion of the cylinder, along with the erosive action of the metallic agglomerate, rapidly wears away the rock, and causes the descent of the perforator. During this operation a core of marble forms in the cylinder. This is detached by lateral pressure, and is capable of being utilized. The tool descends at the rate of from 20 to 24 inches per hour, or from 8 to 10 yards per day in ordinary lime rock.--_Le Genie Civil_.

* * * * *

PORTABLE PROSPECTING DRILL.

The Aqueous Works and Diamond Rock-boring Company, Limited, of London, show at the Inventions Exhibition, London, a light portable rock-boring machine for prospecting for minerals, water, etc. It is capable of sinking holes from 2 in. to 5 in. in diameter, and to a depth of 400 ft. The screwed boring spindle, which is in front of the machine, is actuated by miter gearing driven by a six horse power engine; the speed of driving is 400 revolutions a minute. The pump shown on the left-hand side of the engraving is used to deliver a constant stream of water through the boring bar, the connection being made by a flexible hose. Suitable winding gear for raising or lowering the lining tubes, boring rods, etc., is also mounted on the same frame. The drill is automatic in its action, and the speed can be regulated by friction gearing. The front part of the carriage is arranged so that it can be swung clear of the drill to raise and lower the bore rods, etc.

* * * * *

AUTOMATIC SAFETY GEAR.

Among the safety appliances which are to be found in the Mining Section of the Inventions Exhibition is a model of an ingenious contrivance for the prevention of overwinding, the joint patent of Mr. W.T. Lewis, Aberdare, lead mineral agent to the Marquis of Bute, and W.H. Massey, electric light engineer to the Queen. Both these gentlemen, having been members of jury, were not allowed to compete for an award. The invention, says _Engineering_, seems to possess considerable merit, and it should prove of practical utility in collieries where enginemen are usually kept winding for many hours at a stretch, and where the slightest mistake on the part of the driver may lead to an accident.

Safety hooks are often fitted to winding ropes, and although the damage to life and property is greatly reduced by the use of them, they do not protect a descending cage from injury in a case of overwinding; besides which, they are almost useless when a wild run takes place, an accident which, strange to say, has already occurred many times after engines and boilers have been laid off for repairs. Stop valves are left open, the reversing lever is not fixed in mid-gear, steam is got up in the boilers at a time when no one is in the engine house, and the engines run away.

Various devices have been suggested and tried as a preventive, but their application has either caused as much mischief as a bad accident, or it has depended upon the driver doing something intentionally; whereas in the automatic gear of Messrs. Massey and Lewis, of which an illustration is annexed, there is nothing to cause damage or to interfere in any way with the proper handling of the engines, and it is practically out of the power of the driver to render the gear inoperative. It is here shown in its simplest form as applied to the ordinary reversing and steam handles of a winding engine, the only additions being an arm jointed to the top of the valve spindle, with its connections to the shaft of the reversing lever, and a disk receiving a suitable motion from the main shaft of the engine. On the disk is a projecting piece or stop which is brought into such positions, at or near the end of each journey, that the stop valve cannot be opened, except slightly, when the reversing lever is not set for winding in the proper direction, or when the cages have reached a point beyond which it is undesirable that the engine driver should have the power of turning on full steam. Thus, if one cage is at bank, the driver cannot draw it up into the head gear suddenly; but after it has been lifted slowly off the keeps or fangs, and the reversing lever thrown over, the stop valve can be lifted wide open; and supposing that while the engine is running the driver neglects to shut off steam in proper time, then the projecting piece on the disk in traveling round, slowly or quickly, and by steps according to requirements, will come in contact with the driver, and so prevent an accident by bringing the reversing lever into or beyond mid-gear.

Messrs. Lewis and Massey contemplate the use of governors in combination with various forms of their automatic gear, so as to provide for every imaginable case of winding, and also to avoid accidents when heavy loads are sent down a pit; the special feature in their mechanism being that when two or more things happen with regard to the positions of steam or reversing handles, speed or position of cages in the pit, whatever it may be necessary to do to meet the particular case shall be done automatically.

* * * * *

THE WATER SUPPLY OF ANCIENT ROMAN CITIES.

[Footnote: An address by Prof. W.H. Corfield, M.D., M.A., delivered before the Sanitary Institute of Great Britain, July 9, 1885.--_Building News_.]

As the supply of water to large populations is one of the most important subjects in connection with sanitary matters, and one upon which the health of the populations to a very large extent depends, I propose to give a short account of some of the more important works carried out for this purpose by the ancient Romans--the great sanitary engineers of antiquity--more especially as I have had exceptional opportunities of examining many of those great works in Italy, in France, and along the north coast of Africa. Of the aqueducts constructed for the supply of Rome itself we have an excellent detailed account in the work of Frontinus, who was the controller of the aqueducts under the emperor Nerva, and who wrote his admirable work on them about A.D. 97.

It may be interesting in passing to mention that Frontinus was a patrician, who had commanded with distinction in Britain under the emperor Vespasian, before he was appointed by the emperor Nerva as controller (or, we should say, surveyor) of the aqueducts. He was also an antiquarian, and in his work he not only describes the aqueducts as they were in this time, but also gives a very interesting history of them. He begins by telling us that for 441 years after the building of the city--that is to say, B.C. 312--there was no systematic supply of water to the city; that the water was got direct from the Tiber, from shallow wells, and from natural springs; but that these sources were found no longer to be sufficient, and the construction of the first aqueduct was undertaken during the consulship of Appius Claudius Crassus, from whom it took the name of the Appian aqueduct. This was, as may be expected from its being the first aqueduct, not a very long one; the source was about eight miles to the east of Rome, and the length of the aqueduct itself rather more than eleven miles, according to Mr. James Parker, to whose paper on the "Water Supply of Ancient Rome" I am indebted for many of the facts concerning the aqueducts of Rome itself. This aqueduct was carried underground throughout its whole length, winding round the heads of the valleys in its course, and not crossing them, supported on arches, after the manner of more recent constructions; it was thus invisible until it got inside the city itself, a very important matter when we consider how liable Rome was, in these early times, to hostile attacks.

It was soon found that more water was required than was brought by this aqueduct, and it was no doubt considered desirable to have tanks at a higher level in the city than those supplied by the Appian aqueduct. It was determined, therefore, to bring water from a greater height, and from a greater distance, and the river Anio, above the falls at Tivoli, was selected for this purpose. The second aqueduct, the Anio Vetus, was no less than 42 miles in length, and was, like the Appian, entirely under the surface of the ground, except at its entrance into Rome at a point about 60 ft. higher than the level of the Appian aqueduct.