=31. Floor Construction.=—The floor construction consists of heavy timber girders, no dimension of which may be less than 6 inches, as otherwise it would not comply with the requirements of slow-burning construction. The floor planking consists of 3- or 4-inch tongued-and-grooved spruce, or yellow-pine planking, planed on the under side, and thoroughly spiked to the girder. Planking of the former thickness may be used for clear spans as great as 8 feet, while the latter thickness may be used for up to 10-foot or even 12-foot spans, if the loads are light. The girders are indicated at _d_, and the floor planking at _e_. Usually the girders, in order to obtain the requisite strength, are made of long-leaf yellow pine. On the top of the spruce planking is placed a finished maple floor. This floor is made from either 1-inch maple, which finishes as ⅞ inch, or 1¼-inch maple, which finishes as 1⅛ inches, in thickness. Neponsett sheathing paper, or deadening felt, is placed between the spruce planking and the finished maple flooring for the purpose of preventing dust from percolating through. This sheathing paper or felt is sometimes made waterproof to prevent leakage due to water used for fire-extinguishing purposes.

Frequently, the brickwork is corbeled out, as indicated at _f_, in order to form a fire-stop between floors, or at least to prevent an open joint at this place. Where the walls are offsetted, as shown in Fig. 13, there is no need of corbeling out, for the offset in the brickwork can be made to form the fire or dust stop.

=32.= Where heavy yellow-pine girders bear on brick walls, it is usual to obtain the requisite bearing area by the use of cast-iron bearing plates, as indicated in Fig. 14 (_a_), (_b_), and (_c_). In (_a_) is shown an ordinary flat plate that has an area figured so that the load on the brickwork will not exceed its ultimate stress, which for brickwork laid in lime-and-cement mortar is about 150 pounds per square inch, while for brickwork laid in cement mortar, it is in the neighborhood of 200 pounds per square inch. This plate is usually cast with a lug on the back, as at _a_, to be built in the brickwork, and dowel-pins, or a lip, as at _b_, over which the girder is fitted, or notched. By this means, a tie to the wall is obtained. There is difficulty, however, in using such a connection, for the carpenters on the job frequently miscut their beams, so that the notchings or borings at _b_ do not come where they should, and to remedy the defect, the notchings, or borings, are cut or gouged out, so that frequently the pin or lip at _b_ is not brought to bear against the timber.

A more practicable bearing plate is illustrated in Fig. 14 (_b_). Here, instead of providing dowels, or a lip, to set into the girder, the top of the plate is cast with teeth, as indicated at _c_. While these teeth tend to destroy fibers at the bottom of the beam, they nevertheless sink into the timber, creating great friction, and thus accomplish a tie to the wall fully as efficient as a dowel-pin, or lip, let into the timber would be.

Probably the most common form of bearing plate is that illustrated in Fig. 14 (_c_), which is known as the Goetz-Mitchell bearing box. This is usually built flared, as indicated in the illustration, so that when built into the brickwork it will have a hold in it, and the timber acts as a tie by being notched over the lip, as at _d_ in this figure. These Goetz-Mitchell boxes are generally provided with a plate that sets on top of them, on which the brickwork may be built, and not infrequently the sides of the boxes are grooved so that the ends of the girders are ventilated.

=33. Window Heads.=—In Fig. 12 was shown a form of window head that is the best for strength, but possesses the disadvantage of lowering the top of the window, thus cutting off light to the room, which is a serious objection where the room is wide, or where it depends on the windows in one side for lighting the entire floor area. In order to keep the window head up near the under side of the floor construction, an =I= beam, lintel, or some similar form of support for the brickwork over the head that takes up little room, must be employed. A construction using shallow =I= beams is illustrated in Fig. 15. Here the window head is directly beneath the rough flooring; and while the outside face of the window is formed with an arch, the brickwork above the window head is supported on shallow =I= beams. This figure illustrates a section through the wall extending parallel with the main girders, a bearing being obtained for the floor planking by bolting to the =I= beams a bearing strap _a_.

This construction would not be permitted in some of the larger cities, as the building laws require that all steel beams supporting brickwork must be fireproofed. Consequently, a steel lintel of this construction would have to be surrounded with concrete, and the window head dropped somewhat to allow a bearing for the floor planking, or some other form of construction adopted.

FACTORY BUILDINGS OF REINFORCED CONCRETE

=34.= Within the last few years, the cost of the best Portland cement has been so materially reduced that concrete has become an available material for the construction of factories. Unless used in great masses, however, it has not the strength to support the necessary floor loads without the use of steel reinforcement. As explained in _Design of Beams_, the fibers on the bottom of all beams subjected to transverse stress are in tension, and while concrete has considerable resistance to compression, it offers comparatively little to tensile stress. It is therefore necessary to reinforce the lower portion of all beams and floor slabs as indicated at _a_, Fig. 16.

=35. Advantages of Reinforced Concrete.=—In Fig. 16, the details of a typical reinforced-concrete factory building are illustrated, and a building of this character may be constructed for a cost of from 10 to 15 per cent. greater than the ordinary slow-burning type of building. Besides, this construction possesses the advantage of being practicable for long spans and heavy loads, whereas in buildings of the slow-burning type, owing to the fact that the size of the wooden beams is limited to the available commercial timber, it is frequently impossible to design floors with girders of large spans for floor loads of over 250 pounds per square foot. While this is a heavy load, it is too light for some classes of work, such as occur in printing houses and lithographing establishments where heavy stones are used and stored. The floor loads in such buildings sometimes amount to as much as 300 or 400 pounds per square foot, while it is not unusual to find the load on floors in warehouses amounting to as much as 500 pounds per square foot.

=36. Strength of Concrete Columns With Steel Cores.=—In the building shown in Fig. 17, it will be noticed that the columns are reduced in size in the lower floors, increased in the middle portion of the building, and reduced toward the roof. The reduction in the columns _a_ and _b_ is due to the fact that these columns are reinforced with a steel core composed of structural shapes riveted together, angles usually being employed for this purpose. In proportioning such columns, it is good practice to figure on the ultimate safe unit compressive stress of the steel without considering the reduction made by the usual column formula, but to neglect, in the consideration of the strength of the column, the resistance of the concrete surrounding the steel core. To illustrate, if the sectional area of the steel reinforcements in these columns equals 20 square inches, and a safe unit fiber stress of 16,000 pounds is assumed, the safe strength of the column will be 320,000 pounds.

Above the second floor, the columns are made much larger, for here there is less steel reinforcement, and it is necessary to figure on the safe bearing strength of the concrete.

=37. Strength of Reinforced-Concrete Columns.=—In proportioning reinforced-concrete columns, it is customary among conservative engineers to figure the safe strength of the concrete-column section at 500 pounds per square inch of section; that is, if the column is 20 inches square, its area is 400 square inches, and its safe strength at 500 pounds per square inch will be 200,000 pounds. In the top floor, it is seldom advisable to use concrete columns less than 10 inches square, though at this dimension they generally possess several times the requisite amount of resistance.

All columns in reinforced construction generally have embedded in them 3¾-inch to 1-inch round steel rods, tied together with round iron binders, or bar iron straps as indicated in Fig. 16 (_b_).

=38. Floor and Roof Construction.=—In considering the floor and roof construction of buildings built of reinforced concrete, it will be noted from Fig. 16 that the roof slab is made 3 inches in thickness. Such a slab made of good concrete, reinforced with ⅜-inch steel rods, spaced 6 inches from center to center, will carry the usual roof loads for spans up to 7 feet in the clear.

In forming the gutter for such roofs, as indicated at _b_, the gusset is made by filling in with cinder concrete. Usually cast-iron eave boxes are embedded in the concrete, and these in turn connected with inside rain conductors.

The beams supporting the roof, when the span is from 12 to 14 feet, are made about 12 inches deep and 8 inches wide, while the girders, also constructed of reinforced concrete, are usually made about 3 inches deeper and 11 inches in width.

In order to make the roof impervious to moisture, a covering of felt and slag is commonly employed. This slag joins the parapet wall with the usual tin flashing and counter flashing, as at _c_, though copper is recommended for best work.

In the floor construction of reinforced-concrete factory buildings, the slabs forming the floor panels are made not less than 4 inches in thickness, and seldom over 5 inches, with a 1-inch finish coat of cement besides, if this character of finish is desired. Such a floor slab is shown in the construction at _d_, Fig. 16, while the wooden floor construction is shown in Fig. 16 (_c_). Here the structural feature of the floor is a 4-inch concrete slab upon the top of which is placed 2" × 3" beveled hemlock sleepers, the space between these sleepers being filled with cinder concrete, and the floor finish obtained by laying 1-inch tongued-and-grooved maple floorings.

=39. Reinforced-Concrete Beams and Girders.=—The depth of the beams and girders in reinforced-concrete construction varies, of course, with the span and loads to be supported. Their width enters little into the strength, and they may be made as narrow as possible in order to cover the reinforcing steel. It is the best practice to make beams and girders of the same width, for then the process of forming the molds is greatly simplified and the cost reduced.

In placing the reinforcement in the concrete, it should always be at least 2 inches from the outside surface, for a distance less than this is considered inadequate fireproofing. In order that the reinforcing metal _e_, Fig. 16, may enter over the top of the reinforcing metal at _f_, it is usual to make the secondary girders, or beams, 3 inches less in depth than the main girders. To stiffen the building, brackets are customarily introduced between the column and girders, as illustrated at _g_. These brackets tend to greatly increase the rigidity of the connection and shorten the span of the girder somewhat.

=40. Construction at Window Heads.=—Where it is necessary to have the window head near the top of the ceiling, reinforced-concrete construction lends itself readily to the requirements of this condition, for even where girders are supported over the window head, the construction may be followed out, as indicated at _h_, Fig. 16. Where it is desired to have the window head raised still higher, a construction similar to that shown in Fig. 18 may be used. In this case, however, care must be taken to have the girders bear on the piers between the windows, and to have no intermediate beams.

=41. Column Footings.=—With factory buildings of more than five or six stories in height, great pressure is transmitted to the soil from the base of the bottom column, and as it is necessary with soils of even fairly good bearing capacity to have footings beneath the piers supporting columns of from 6 to 10 feet square, adequate means of providing these footings must be obtained. In Fig. 19 (_a_) and (_b_) are shown two types of footings for concrete columns. In (_a_) is indicated a reinforced-concrete column with a steel core. In such an instance, all the load is transmitted by the steel core through its angle plates and webbing at the foot to grillage beams. These grillage beams are, however, not made sufficiently large to transmit the load to the soil, but merely to distribute the load on the bed of concrete. The spread portion of the footing is reinforced with steel rods _a_, _a_ crossed each way, and longitudinal shear is taken up in the footing by means of stirrups _b b_. This is the usual type of footing construction under reinforced-concrete factory columns.

Where, however, the column is not reinforced with a steel core, but is merely a pier, footings may be designed as illustrated in Fig. 19 (_b_). Here the base of the column is enlarged in order to better distribute the load on the several steps of the footing, and where the bottom step has a considerable overhang, it is reinforced with steel rods and stirrups, as indicated.

=42. Detail of Slab and Girder Reinforcement.=—In the previous article, the general construction of the floors and column supports of a factory building was explained. By referring to Fig. 20, it will be shown how the girders and beams are reinforced with the steel bars. In this figure, a plan is indicated at (_a_) and an elevation at (_b_). The rod reinforcement of the slab is shown in the plan at _a_, _a_. It will be noticed that over every other beam these rod reinforcements lap, or break joints, and that some additional tie or reinforcement is placed over the girders, as indicated by _b_, _b_. These latter rods tend to tie in the floor slabs still more rigidly than can be accomplished with their individual reinforcement.

Referring to the elevation (_b_), it will be noticed that all the reinforcement of the beams is not usually carried along the lower portion of the girder for its entire distance, but that some of the reinforcement is bent up at a point about one-quarter of the span from the abutment, in the form of a camber rod. By arranging the reinforcing rods in this manner, an additional stirrup action, or tie, to the girder supports is provided, and the oblique section made by a horizontal line passing through these rods tends to provide additional resistance to the horizontal shear in the beams and also provide for negative bending moment produced in the beams near the support. To further provide for this, shear stirrups are placed closer together, toward the abutments, as indicated at _c_, _c_. These stirrups are ordinarily light pieces of bar iron bent in a =U=-shape, and sometimes bent around the rod reinforcement, a detail of this stirrup being shown in Fig. 20 (_c_).

STEEL-FRAME MILL BUILDINGS

=43.= There is a type of building which, while not distinctly mill construction as usually understood, is frequently used for one-story buildings, such as rolling mills, cement works, machine shops, foundries, rail yards, and buildings of this class.

The essential feature of these buildings is a steel-roof truss supported on steel columns, the columns being braced both to the truss and longitudinally of the building. It is usually the purpose in the design of such buildings to neglect everything but the necessary stability and the first cost. The steelwork, consequently, is of the lightest possible construction, usually designed for a unit fiber stress of from 18,000 to 20,000 pounds, and the covering of the sides of the building, together with window details, etc., is made only sufficiently good to keep out the weather.

=44. Material for Roof Covering.=—The roof covering of this class of building is either of slag on 2-inch spruce plank, spiked to nailing strips bolted on to steel purlins from beneath, with lagscrews, or of slate laid on 1-inch or 2-inch sheathing boards. Even galvanized iron is used for the roofing of some of the cheapest class of buildings, especially those which, owing to the process of manufacture, are subjected to a high temperature.

=45. Construction of Sides of Building.=—The sides of these buildings may be covered with either expanded-metal lath on metallic furring strips, plastered inside and out with cement mortar so as to form a fireproof and rigid screen wall about 2 inches in thickness; or, the walls may be 9-inch or 13-inch brick walls built part way up the height of the columns and leaving the columns exposed on the face; or, corrugated galvanized iron lapped 6 inches and secured either by riveting to metallic supports or nailed to wooden studding secured to the steel frames. Of these constructions, probably the first is the most expensive and also the most satisfactory.

=46. Partially Supported Steel-Frame Building.=— In Fig. 21, there is designated a type of construction that may be built for about $1 per square foot of the area covered. This consists of steel =I= beams, or angle-and-plate columns, used for column supports carrying the usual angle iron steel-roof truss. The roof is sheathed with 2-inch spruce tongued-and-grooved planking, covered with a good quality of roofing felt and slag, with a stop-gutter _a_ at the edge. Owing to the fact that the steel columns are supported in a direction of their minimum radius of gyration by means of the brick walls, they can be made very light. The building illustrated has what is known as a _saw-tooth roof_. By this means, light is obtained on the side next to an adjacent and higher building by means of a sash _b_. This sash is usually made hinged or pivoted, to provide the necessary ventilation.

=47.= In Fig. 22, there is illustrated, diagrammatically, the framework of a one-story skeleton-construction building. In the design of all such buildings, where there are no end gable walls, the several columns and trusses must be braced diagonally, as indicated at _a_, _a_, and frequently it is necessary to introduce a secondary system of horizontal bracing from one panel point on the lower chord to another, as indicated at _b_, _b_.

In placing galvanized ironwork on the sides of steel-mill buildings, it is best to construct the necessary framework between the main supporting members of the building of light angles, or tees. These should be furnished punched with ⅜-inch or ⁵/₁₆-inch holes, to which the galvanized iron may be riveted, it being best to mark the galvanized iron in the field and punch it there. This may be done without much difficulty with the usual light gauge used for this purpose. It is sometimes necessary with this construction to flash around the window and door heads with IX tin.

DETAILS OF MILL CONSTRUCTION AND DESIGN

STRUCTURAL FEATURES

BEAM CONNECTION TO GIRDERS

=48.= In factory construction, the headroom is seldom available to support beams on the girders, as indicated in Fig. 23 (_a_). It is usually necessary, in order to cheapen the construction of mill buildings, to keep the distance between the clear headroom and the finished floor level to the very minimum, and consequently the tops of the beams are most always brought flush, or nearly so, with the top of the girder.

A common construction is to use some of the various forms of wrought-iron hangers, as shown in Fig. 23 (_b_). The type of hanger shown is a single stirrup, and is probably the best of any on the market; where beams enter the girder on both sides, the hanger is designed double. While it is popularly supposed that this hanger would readily fail by the bending of the metal at _a_, it is usually proportioned to safely carry any reaction imposed under ordinary floor loads. This hanger is obtained stamped out of steel plate or formed from bar iron.

=49.= Where it is not desirable to use wrought-iron or steel hangers, a simple and inexpensive form of construction may be adopted as that shown in Fig. 23 (_c_). Here the beam _a_ is supported on a wooden strip _b_, which extends the full length of the girder, and is bolted near the bottom with through bolts. Such a construction provides sufficient strength for the support of the average factory floor, but its strength is difficult to figure with any degree of certainty, and some surer form of connection is generally considered preferable. In all instances, it is good practice to tie together the opposite floor-beams butting on a girder by means of an iron dog, or tie-plate, _c_.

=50.= In Fig. 24 (_a_), (_b_), (_c_), and (_d_) are indicated other methods of supporting the secondary floor-beams on main girders in the construction of factories. In Fig. 24 (_a_) is shown an =I=-beam girder supporting heavy timbers of a floor of slow-burning construction. It is always necessary in this construction to bring the top edge of the timbers above the upper flange of the =I= beam, and to span the space _a_ thus created with a piece of timber for a tie and for the support of the floor planking. By providing this space between the ironwork and the wooden tie, any shrinkage that may occur in the secondary timbers will not cause the floor to ride on the top of the steel beam and thus make a ridge evident in the finished floor at this place. The timbers forming the secondary girders may either be supported on angle-iron brackets, or on angle irons extending the entire length of the girder. The latter method is only pursued when it is necessary to keep the end of the timber a few inches away from the steel beam, and the angle, consequently, being subjected to a greater bending moment, must have more resistance by increasing the width of the section of the bracket.

Sometimes, the secondary beams are supported on double stirrup hangers, as shown in Fig. 24 (_b_). When it is not desired to use steel beams, resort is frequently had to flitch-plate girders. They are, however, held in some disfavor by the building departments of the several cities, who do not consider that the combined strength of the timber and metal can be taken, and will only permit the strength of either the timber or metal to be used.